Post Ground Sleeve
Down - Bow
Up - Arch
Crossbar
Cause Bow
in Crossbar
Cause Bow
in Crossbar
Left Post
Right Post
Concrete
Field Surface
Large Stone
Cause Arch
in Crossbar
Cause Arch
in Crossbar
Front View
7. Set assembled goal posts with post ground sleeves, back poles and back poles ground sleeves into holes.
Plumb and level goal, making sure the bottom of crossbar is 8 feet from the field surface. Face of the goal
post should not enter into playing field. Seal space between left post and right post, and post ground
sleeve with tape, or small bead of sealer. Do the same for the back pole and back pole ground sleeve. This will
stop debris from entering ground sleeves during construction.
8. Fill holes with concrete, flush to the top of ground sleeves. Be sure to level back poles before concrete begins
to cure. After concrete has fully cured, see Step 15 for test procedures to ensure the goal has been
anchored properly.
9. Attach net frame channel connector, to left post and right post, as shown.
3/8” x 7/8” Hex Bolts
3/8” Lock Washers
3/8” Flat Washers
3/8” Square Nuts
Field Surface
Net Frame
Channel Connector
NZ225 Rev. 03/04/19
***CAUTION***
This goal has been designed to be used for the game of soccer only. Goal posts must be anchored AT ALL TIMES
and shall be secured against overturning. Do not climb on the net or goal framework at any time! All fastenings
must be checked to insure they are fully tightened before and after each use of this product. Goal posts not in use
must be disassembled and properly stored in a safe, secure area (See included Guidelines for Movable Soccer Goal
Safety.). Assembled goal posts should not be left unattended. Remove nets when goals are not in use. Do not use
this equipment during the threat of high winds. Goal posts should be checked for safety before and after each use.
All warning and safety labels included with this product must be visible at all times.
Any modifications to this or any Kwik Goal product will void any and all warranties.