background image

80

80

Finishing the field

Field was successfully recorded.

Field was successfully recorded.

Содержание Optima TFprofi ll

Страница 1: ...Manual to setup precision drill Optima TFprofi ll in the filed 1 Assembly after transport ...

Страница 2: ...2 2 Technical data ...

Страница 3: ...3 3 Technical data ...

Страница 4: ...4 4 For your safety ...

Страница 5: ...5 5 Tightening torques ...

Страница 6: ...6 6 Frame ...

Страница 7: ...7 7 Rows Standard Row HD Row ...

Страница 8: ...8 8 Rows HD 2 Row SX Row ...

Страница 9: ...9 9 Mikrogranulat ...

Страница 10: ...10 10 Delivery and assembly fixing points for crane loading ...

Страница 11: ...11 11 Delivery and assembly fixing points for forklift ...

Страница 12: ...12 12 Delivery and assembly remove fixing of drawbar ...

Страница 13: ...13 13 Delivery and assembly pull hydraulic hoses through the drawbar ...

Страница 14: ...14 14 Delivery and assembly fix the drawbar with screws and connect the hoses with the tubes Fastening touque 214 Nm ...

Страница 15: ...15 15 Delivery and assembly remove the transport ring ...

Страница 16: ...16 16 Delivery and assembly remove the fixing bracket for the drawbar before folding the machine ...

Страница 17: ...17 17 Delivery and assembly assemble the loading platform ...

Страница 18: ...18 18 Delivery and assembly assemble bracket for tool box ...

Страница 19: ...19 19 Delivery and assembly adjust track marker ...

Страница 20: ...20 20 Delivery and assembly removed parts ...

Страница 21: ...21 21 Comments ...

Страница 22: ...22 22 Comments ...

Страница 23: ...2 Coupling of the machine with the tractor Manual to setup precision drill Optima TFprofi ll in the filed ...

Страница 24: ...24 24 Mechanical coupling ...

Страница 25: ...25 Mechanical coupling PTO 800 RPM standard PTO 1000 RPM optional In working position the drawbar must be level ...

Страница 26: ...26 26 Hydraulic connections ...

Страница 27: ...27 27 Option 01 non ISOBUS tractor CABLE POWER ITH Option 02 ISOBUS tractor Integrated terminal Option 02 ISOBUS tractor INCAB CABLE Electrical connections ISOBUS ...

Страница 28: ...28 28 Option 01 non ISOBUS tractor ...

Страница 29: ...29 29 Option 01 non ISOBUS tractor ...

Страница 30: ...30 30 Option 01 non ISOBUS tractor ...

Страница 31: ...31 31 Option 02 ISOBUS tractor ...

Страница 32: ...32 32 Camera connection iM Tellus Pro iM Tellus GO direct connection iM Tellus needs adapter cable A Cam cable X to the Monitor Y Power cable ...

Страница 33: ...GPS connection GPS antenna connection cable 12 pin Male connector In Cap Female Connector In Cap Male Connector 12 pin Female connector RS232 Female Connector RS232 Male Connector In Cap Male Connector 33 ...

Страница 34: ...ion RS232 Male Connector In Cap Male Connector In Cap Female Connector In Cap Male Connector Male 12 pin connector 12 pin Female connector RS232 Female Connector GPS antenna connection cable GPS antenna connection cable ...

Страница 35: ..._________ ________________________________ ________________________________ ________________________________ ________________________________ ________________________________ ________________________________ ________________________________ ________________________________ ________________________________ ________________________________ ________________________________ ___________________________...

Страница 36: ...36 36 Comments ...

Страница 37: ...37 37 Comments ...

Страница 38: ...3 Preparation of the machine for setup in the field Manual to setup precision drill Optima TFprofi ll in the filed ...

Страница 39: ...39 39 Frame adjustment parallel to the ground ...

Страница 40: ...d set the inclination angle as desired Light soil Disc vertical set no or only small inclination angle Set the working width For the Track markers from the coulter to the marker disc Row spacing 75 cm Working width 600 0 cm Row spacing Working width 2 75 600 337 5 2 ...

Страница 41: ...41 41 Adjustment standard row Seed depth adjust seed depth with the crank Units on the scale are not centimeters ...

Страница 42: ...3 steps Position 1 0 kg Position 2 22 5 kg Position 3 45 kg Intermediate press wheel Lift the intermediate press wheel under sticky conditions Seed deepness Adjust seed deepness with the crank Units on the scale are not centimeters Park position Deactivate Park position for seeding ...

Страница 43: ... steps Position 1 0 kg Position 2 22 5 kg Position 3 45 kg Intermediate press wheel Lift the intermediate press wheel under sticky conditions Seed deepness Adjust seed deepness with the crank Units on the scale are not centimeters Park position Deactivate Park position for seeding ...

Страница 44: ...44 44 Deliverable seed discs Optima more seed discs available ...

Страница 45: ...45 45 Adjustment seeding heart open seeding heart adjust lower scraper adjust upper scraper adjust sliding cover ...

Страница 46: ...46 46 Adjustment seeding heart rape kit rape kit open seeding heart Opto sensor in position empty seeding heart ...

Страница 47: ...47 47 Adjustment seeding heart open seeding heart adjust lower scraper adjust upper scraper adjust sliding cover ...

Страница 48: ...48 48 Adjustment seeding heart SX coulter Catch wheel locking seed disc rape kit open seeding heart open seeding heart open seeding heart ...

Страница 49: ...49 49 Adjustment airflow over pressure only SX negative pressure ...

Страница 50: ... to flow into the feeding hopper Do not overfill the fertilizer hopper Only machines with hydraulically driven fertilizer have a metering device Set the valve to Filling auger Switch off Set the valve to Closed Only machines with hydraulically driven fertilizer have a metering device Set the valve to Fertilizer spreader Activate the control unit on the tractor 50 ...

Страница 51: ...51 51 Fertilizer ...

Страница 52: ...52 52 Comments ...

Страница 53: ...53 53 Comments ...

Страница 54: ...4 Calibration of fertilizer metering Manual to setup precision drill Optima TFprofi ll in the filed ...

Страница 55: ...55 55 Gear box with chain wheel 15 10m chain wheel 15 cell wheel 4 0 mm Drive wheel Drive wheel ...

Страница 56: ...56 56 Gear box with chain wheel 28 10m chain wheel 28 cell wheel 4 0 mm Drive wheel Drive wheel ...

Страница 57: ...57 57 Gear box with chain wheel 15 10m chain wheel 15 cell wheel 7 5 mm Drive wheel Drive wheel ...

Страница 58: ...58 58 Stepless gear box 8 x 10 m ...

Страница 59: ...59 59 Stepless gear box 8 x 10 m ...

Страница 60: ...60 60 Calibration test of fertilizer ...

Страница 61: ...61 61 Calibration test of fertilizer ...

Страница 62: ...62 62 Calibration test of fertilizer ...

Страница 63: ... driven fertilizer The weight is always given for all outputs and has to be multiplied by the weighted fertilizer Calibration test at one dosing device Weighed 10 24 kg x 2 20 48 kg Calibration test on a coulter Weighed 2 56 kg x 8 20 48 kg ...

Страница 64: ...64 64 Calibration test granule ...

Страница 65: ...65 65 Calibration test granule ...

Страница 66: ... for entering comments Selection of microgranules Mesurol Counter SG Other Fertilizer Selection of the unit of measure kg ha g 100m g m2 Input of the quantity to be delivered Enter the intended driving speed Cell wheel or cell wheels for the entered Influencing factors come into question ...

Страница 67: ...67 67 Calibration test granule Start screen Calibrate Start calibration Calibration is running Enter the weighing result g in the input field Confirm with the green tick Successful calibration ...

Страница 68: ...5 Task controller and GEOCONTROL basics Manual to setup precision drill Optima TFprofi ll in the filed ...

Страница 69: ...ine the accuracy Mobile base station Small mobile antenna mostly on the edge of the field covers a small area Fixed base station Fixed base antenna usually on a higher point covers a larger area Basis Station Mobile RTK MTG Satellites Overview satellite navigation systems NAVSTAR GPS USA GLONASS Russia Galileo European Union Beidou Compass China Quasi Zenit Satellite System Japan ...

Страница 70: ...70 70 Signal accuracy Accuracy in cm radius RTK GPS 2 cm DGPS 600 cm GPS 3000 cm The more accurate the signal the more accurate the start and stop time of the machine DGPS 1200 cm seed drop point ...

Страница 71: ...ction roll yaw pitch In addition the signal and the antenna position have a great influence on the start and stop time of the machine An inclination of the antenna axis supports the start and stop time of the machine ...

Страница 72: ...he GPS system This can be due to electricity pylons or high load of the mobile network When driving with GPS applications it is important to know that the machine is treated as a slave The GPS application is responsible for the start and stop of the machine Most antennas emit the same position coordinates if there is a loss of signal For the machine this means that it stops and shuts off the meter...

Страница 73: ...terminal 3rd party antenna has to be compatible with NMEA Output to serial port Sending the GGA protocol NMEA0183 GPGGA message Supported baud rates 4800 9600 19200 38400 59600 115200 Needed update rate 5 or 10 hz IsoMatch Global ...

Страница 74: ...74 74 activate the task controller enter the license key task controller is activated Task controller 74 ...

Страница 75: ... middle hitch The fertilizer is placed as a slave behind the drill function section control is only possible if the monitor supports this Fertilizer Ai if the machine is not attached in the middle Bi middle wheels to middle coulter here we work with minus Ci middle wheels to middle hitch Offsetting the machine ...

Страница 76: ...76 76 Screen overview ...

Страница 77: ...antenna position At when the antenna is not centered Bt middle antenna to middle wheel Ct center wheel to middle coupling point Dt antenna height Et axle to axle tractor Geo control loads the offset automatically from the machine ...

Страница 78: ...ect existing field Activate record boundary A B Line is used when you will have a virtual A B line Select recording left ore right Device independent is used for a free boundary recording Enter task and field name The green frame on the right side shows that everything is right and you can start with the work 78 ...

Страница 79: ... Section control is activated Boundary recording is activated Task is activated Connects the last recorded point of the field boundary with the current position Boundary is finished Boundary is recorded Boundary is not recorded ...

Страница 80: ...80 80 Finishing the field Field was successfully recorded Field was successfully recorded ...

Страница 81: ... field setup in Menu Field tab Changing Headland settings Working width Width covered by the implement Track overlap Overlap between two parallel cultivations a negative overlap leaves a gap between cultivations Track offset Offset from field boundary to the first headland guidance line Headland width Width of the headland ...

Страница 82: ... regularly and make no Difference between main field or headland Use this state to get manual guidance parallel to the field boundary while working the headland Use this state to work first the interior of the field before working the headlands ...

Страница 83: ...83 83 Section control section control tab To edit the section control settings press the section control settings button ...

Страница 84: ...84 84 Section control ...

Страница 85: ...85 85 Section control ...

Страница 86: ...86 86 Section control ...

Страница 87: ...87 87 Comments ...

Страница 88: ...6 Trouble shooting Manual to setup precision drill Optima TFprofi ll in the filed ...

Страница 89: ...ror SENS PWR1 0V 1 Monitor does not start 6 Hydraulic motor for fertilizer does not turn 5 Markers do not change on the headland 7 Revolutions of hydraulic motor for fertilizer is very high 8 The LED on the marker sensor lights the marker is raised but on monitor shown that the marker is lowered ...

Страница 90: ... of the planter are lowered and raised not synchronic 9 Machine is in working position end switches are activated speed sensor receives signal but motors of the seed rows do not turn STOP symbol is shown on the monitor 12 Error Hardware spec do not match while flashing of mechanical machines Visus or Signus Monitor via Flash Can program ...

Страница 91: ...k fuses 5 60 A and 6 30A on the ITH cable Non ISOBUS tractor Trouble shooting answers 2 The machine cannot be loaded on the monitor a No power on ISO cable 2 The machine cannot be loaded on the monitor b Implement software is not installed ...

Страница 92: ... markers turbines limit switches a Check fuse 30A left b If one of the sensors is faulty or short then SENS PWR2 0V To find a faulty sensor during disconnecting all sensors one by one check voltage of SENS PRW2 30A 30A 3 Error SENS PWR1 0V SENS PWR1 Power for motors Check fuse 30A right ...

Страница 93: ... shows also that right marker is lowered b Change connection of electro hydraulic valves for markers on PCB 5 Markers do not change on the headland a In the monitor the button for left marker is activated on machine is left marker lowered but monitor shows that right marker is lowered a Change connection of sensors for markers on PCB ...

Страница 94: ...e distance between sensor and gear wheel more than 3 mm the system does not register pulses and revolutions of the hydraulic motor increase 8 LED на датчике маркера светится маркер поднят но в рабочем меню показывает что маркер опущен Проверить кабель сигнала датчика черный Если нет сигнала то LED светится но датчик не имеет функции 9 Machine is in working position end switches are activated speed...

Страница 95: ...osing Mechanical drive Pressure setting Machine is in position On headland Slowly open shut off valve until pressure gauge shows 100 bar Close shut off valve If machine is fully lowered pressure may increase to 120 bar Trouble shooting answers 10 Calibration of the ground following system ...

Страница 96: ...osition both wheels on side wings are raised The piston rods of the transport wheels should not be completely out and the piston rods of the copying cylinders must be fully inside of cylinders Close shut off valves B and C Put machine in working position Put machine in position On headland piton rods of all four cylinders are outside Measure the length of the piston rods of the copying cylinders s...

Страница 97: ...g connection on the motor b Check if there is a short on the opto sensor cable ground and power a b 12 Error Hardware spec do not match while flashing of mechanical machines Visus or Signus Monitor via Flash Can program Exchange ECUAPPS ini file in Flash Can installation folder ...

Страница 98: ...7 Technical Service Manual Manual to setup precision drill Optima TFprofi ll in the filed ...

Страница 99: ...ON R1 ECU_PWR 1 M red 0 5mm 1 red 12V_PWR red 2 5mm A 4 red ECU_PWR N red 6 0mm 3 red ACT_PWR Y black connected O black 6 0mm 1 black ACT_GND Z black connected P black 2 5mm 2 black ACU_GND black 0 5mm B 3 black 12V_RTN Article number MT00000646 Description CABLE POWER ITH L 4 5m Article number MT00001838 Description CABLE POWER ITH L 6 0m Purpose connect ITH cable from rear front tractor to batte...

Страница 100: ...h Tellus signal available cable green cable white relay is switching voltage measure is able at the exit of the cable If no voltage is measureable at the exit IsoMatch Tellus is switched off IsoMatch Tellus switch on fuse damaged exchange fuse relay is not switching ITH cable has to be exchanged cable damaged ITH cable has to be exchanged CAN BUS cable for ISOMatch rot voltage 12 V black ground 0 ...

Страница 101: ...0500 B to ITH Article number MT00001146 Description CABLE CAN ITH IM TELLUS Purpose Connect IM Tellus to ITH cable X to IM Tellus A to ITH B to MT00000500 C is diagnostic connector Colour number length pos function pos function 1 3 mtr A 2 ON R1 ECU_PWR 2 4 ON R2 ACT_PWR 3 1 TBC_PWR 4 3 TBC_RTN 5 B 4 CAN_L 6 2 CAN_H 7 1 TBC_PWR yw grn 3 TBC_RTN 1 1 mtr C B ECU_PWR diag C E not used 2 A ECU_GND dia...

Страница 102: ... ECU_PWR 2 3 3 TBC_RTN 3 4 4 ON R2 ACT_PWR 4 B 1 5 TBC_PWR 5 2 6 CAN_H 6 3 7 TBC_RTN 7 4 yw grn CAN_L yw grn Article number MT00000965 Description CABLE CAN ITH F2R L 6m Purpose To connect front connector tractor to MT0000964 A to ITH B to MT00000527 Wires to MT00000964 pos colour number function lenght colour number A 2 blue ON R1 ECU_PWR 6 m blue 3 orange On R2 ACT_PWR orange B 2 yellow CAN_H ye...

Страница 103: ...tion bridge 6 TBC_PWR red power supply for termination 12 V 7 TBC_RTN black ground for termination ground 8 CAN_H yellow data transmission twisted 9 CAN_L green data transmission ISOBUS Plug 11783 2 3 1 4 9 8 7 6 5 ISOBUS Connector PIN Description 1 Actuator ground black 60A 2 ECU ground black 25 A 3 Actuator power red 60A 4 ECU power red 25 A 5 Internal connection for TBC switching 6 TBC power re...

Страница 104: ...C Tractor bus CAN high Internal BUS D Tractor bus CAN low Internal BUS E Not used F Proprietary OEM G Proprietary OEM H Implement bus CAN be high External BUS J Implement bus CAN be low External BUS E D A C F G H J B ISOBUS Diagnostics ...

Страница 105: ...onnector motor encoder sensor pin 1 free pin 2 GND blue pin 3 5V brown pin 4 ENC A yellow Pin 5 ENC B black connector main pcb pin 1 12V brown pin 2 GND white pin 3 ENC A pink pin 4 ENC B green pin 5 sync yellow pin 6 opto grey signal green blue Sowing heart e drive II connection motor For Control amperage of motor working 2A Alarm occuring 4A Max amperage 4 8A ...

Страница 106: ...ly one pulse per disk revolution The distance from the sensor head and the pin on the seed disk is between 1 5 3 5 mm The sensor has a maximum operating distance of 4mm For correct sensor setting please turn the sensor to the end position contact with the pin and then twice turns back Available seed disc with sensor pin 1 1250 2 2450 3 2420 for sugar beet 4 Sensor pin ...

Страница 107: ...107 107 Main box Master PCB schematics ...

Страница 108: ...108 108 Main box Slave PCB schematics ...

Страница 109: ...109 109 Main box Master PCB schematics ...

Страница 110: ...on plugs for seed rows signal from each motors from1 to 12 Connection plugs for hydraulic valves and PEM Main box PCB for e drive II 2 x 30A fuses parallel connection for motor output if there is ashort circuit on a motor at least one fuse will burn if electrical power is too high both fuses will burn ...

Страница 111: ...ntrol LED s for all sensors inputs Remarks If main power voltage is failure or the both fuses 30 A are blown the power part for the motors on the board will be completely switch off but through inactive galvanic isolation the signal board is further energized Remarks All the sensors are equipped with an additional control LED diode When the sensor receives a signal a diode will be shining This mak...

Страница 112: ...112 112 Main box PCB hydraulic fertilizer drive Test LEDs hydraulics Test LEDs sensors LED is flashing if prozessor is working and software is ok ...

Страница 113: ..._FERT Version 1 04 radar was connected to e_drive_fert circuit board Speed signal was sent to e_drive_2 software via can bus message Adjustment for e_drive_2 software version 1 06 was COMBI Adjustment for e_drive_fert software version 1 04 was Radar OLD radar connected to e drive fertilizer mainboard ...

Страница 114: ...ons E_DRIVE_FERT_1 05 Radar is connected to e_drive_2 circuit board Speed signal is sent to e_drive_fert software via can bus message Adjustment for e_drive_2 software version 1 07 Radar Adjustment for e_drive_fert software version 1 05 COMBI NEW radar connected to e_drive_2 mainboard ...

Страница 115: ...ound brown 12V Logical AND Connection 2 switches on every machine except TF profi no possibility to stop metering because of undulated surface Activated if machine is lifted headland switches work with LOW signal metering stops also with speed signal Test function Measure brown 12 V against blue ground work switch activated 0 V work switch deactivated 12 V Work switch ...

Страница 116: ... V DC Cable black ground brown 12 V blue signal Switching distance 0 5 3 mm Test function activation of voltage supply measurement of voltage between brown and blue with metal on Sensor ca 12 V DC sensor closed without metal on Sensor ca 0 V sensor opened Track marker ...

Страница 117: ...and signal green generate a movement under the sensor area with movement 0 6 5 V DC dependent on the intensity of movement without movement 0 V Speed sensor Calibration and Check calibration 1 press START 2 drive exact 100 m in field speed 0 5 km h 3 press STOP realistic data 18000 20000 100 m ground conditions can influence the data minimal speed during the calibration 0 5 km h ...

Страница 118: ... V DC Cable white ground green signal Switching distance 0 5 3 mm Test function activation of voltage supply measurement of voltage between green and white with magnet on sensor ca 12 V DC sensor closed without magnet on sensor ca 0 V sensor opened Metering sensor ...

Страница 119: ...wn 12 V black signal Switching distance 0 5 3 mm Test function activation of voltage supply measurement of voltage between brown and black with metal on sensor ca 12 V DC sensor closed without metal on sensor ca 0 V sensor opened Metering sensor for hydraulic fertilizer drive ...

Страница 120: ...oltage supply 12 V DC Cable black ground brown 12 V blue signal Switching distance 0 5 3 mm Test function activation of voltage supply measurement of voltage between brown and blue with metal on sensor ca 12 V DC sensor closed without metal on sensor ca 0 V sensor opened ...

Страница 121: ... control system Automatic tramlining if pre emergence marker fits Monitoring of drive speed and power supply Determination of the processed area Display for showing drive speed Display of the rotational speed of the fertilizer metering device shaft ...

Страница 122: ... of to high current if fuse is damaged LED off outputs not able to be activated input Control LEDs 1 LED off particular input is activated sensor active All LED off short cut on board RUN LED is running RUN LED Blinking Software is running short blink during boot process start Bootloader activated no software on board Off no software no voltage or processor damaged A 10 B 11 C 12 D 13 E 14 F 15 Nu...

Страница 123: ...to sensor sender receiver combined in sensor housing if a barrier blocks sensor arrear low signal for 4 ms is generated test function difficult possible with oscilloscope LED on board blinks only very light Error facilities With alarm and no corn missing Open the seeding heart clean the sender and receiver of the sensor sensors have to be very dry and clean close the seeding heart ...

Страница 124: ...n 2 switches on every machine except TF profi no possibility to stop metering because of undulated surface activated if machine is lifted headland switches work with LOW signal metering stops also with speed signal Test function work switch activated 0 Ω work switch deactivated Ω Work Switch 1 Work Switch 2 Metering Stop Control box Visus circuit board ...

Страница 125: ...12V Switching distance 0 5 3 mm Test function deactivate voltage supply measurement of resistance between blue and brown put a magnet in south pol direction to the sensor with magnet on sensor 0 Ώ sensor closed without magnet Ω sensor opened Control box Visus circuit board ...

Страница 126: ...le white ground green signal Switching distance 0 5 3 mm Test function activation of voltage supply measurement of voltage between white and green with magnet on sensor ca 12 V DC sensor closed without magnet on sensor ca 0 V sensor opened Control box Visus circuit board ...

Страница 127: ...ble white ground green signal Switching distance 0 5 3 mm Test function activation of voltage supply measurement of voltage between white and green with magnet on sensor ca 12 V DC sensor closed without magnet on sensor ca 0 V sensor opened Control box Visus circuit board ...

Страница 128: ...y 12 V DC Cable White ground brown 12 V Test function work behaviour like actors controlled with 12 V on the board outputs measurement of output voltage white against brown output activated ca 12 V DC clutch is working Control box Visus circuit board ...

Страница 129: ...ectronics orange 13 2 V With switched on electronics orange 0 V Blue CAN low 2 5 V CAN bus Yellow CAN high 2 5 V CAN bus Green Ground Black Switched on supply voltage for terminal and board With switched on electronics black With switched off electronics black 0 V Control box Visus circuit board ...

Страница 130: ...130 130 Control box Visus cable to monitor ...

Страница 131: ...ched off For example when individual sowing units are raised at the edge of the field so that the full working width is not used to sow Seeding machine settings menu PIN 51 Enter PIN The subsequent menu items can only be changed by using a PIN Changes should be only made by a trained service technician The set values can be displayed for information purposes without using a PIN With a calculated t...

Страница 132: ...l manually Test the sensor on the fertilizer metering device shaft Turn the drive wheel manually Test the limit switch for the working position Raise or lower the machine Start Stop NOTE A limit switch is only possible on machines which are equipped for creating tramlines The tram lining rhythm is controlled by using the limit switch ...

Страница 133: ...ian on display of the last active optosensor Left Number of sowing units Right Number of the last active optosensor PIN 51 Enter PIN The subsequent menu items can only be changed by using a PIN Changes should only be made by a trained service technician The set values can be displayed for information purposes without using a PIN Revert to factory settings Total number of prepared fields in hectare...

Страница 134: ...m ISOMatch TopService internal cable to update mainboard and seedunits external cable to update the mainboard MB the tractor control TC and the visual terminal VT mainbox cable to terminal USB CAN adapter socket for diagnostic cable adapter for ISOBUS diagnostic ...

Страница 135: ...135 135 Software update 2 Start the IsoMatch TopService tool ...

Страница 136: ...136 136 Software update 3 Do the software update Press Select and choose the correct software after selecting press Update ...

Страница 137: ...137 137 Hydraulic connections ...

Страница 138: ...138 138 Hydraulic schematics working wheels and hydraulic drive for fertilizer ...

Страница 139: ...139 139 Hydraulic schematics working wheels and hydraulic drive for fertilizer From machine ID ACPNPxx14610 ...

Страница 140: ...140 140 Hydraulic schematics working wheels and mechanical drive for fertilizer ...

Страница 141: ...141 141 Hydraulic schematics working wheels and mechanical drive for fertilizer chassis marker arms folding filling auger fan ...

Страница 142: ...142 142 Hydraulic schematics working wheels and mechanical drive for fertilizer ...

Страница 143: ...143 143 Hydraulics ground following system ...

Страница 144: ...al drive of fertilizer Setting pressure When the machine is raised open it slowly until the pressure on the gauge is about 100 bar than close again The pressure can rise until 120 bar when the machine is fully lowered B and C valves for calibration of chassis and ground following system A C B ...

Страница 145: ...l mechanical drive of fertilizer Setting pressure When the machine is raised open valve A slowly until pressure on the gauge is about 100 bar than close the valve A The pressure can rise until 120 bar when machine is fully lowered B and C valves for calibration of chassis and ground following system ...

Страница 146: ...lves B and C 3 Put machine in transport position both wheels on side wings are raised The piston rods of the transport wheels should not be completely out and the piston rods of the copying cylinders must be fully inside of cylinders 4 Close shut off valves B and C 5 Put machine in working position 6 Put machine in position On headland piston rods of all four cylinders are outside 7 Measure the le...

Страница 147: ...147 147 Overview of alarms e drive II 1 05 software ...

Страница 148: ...148 148 Overview of alarms e drive II 1 05 software ...

Страница 149: ...149 149 Overview of alarms e drive II 1 05 software ...

Страница 150: ...150 150 Overview of alarms e drive II 1 05 software ...

Отзывы: