
Electrical circuitry on this
machine is protected by an
approved lockable disconnect
circuit. In addition to this equip-
ment, you must install an
approved disconnect for the
electrical power supplying this
machine.
When opening the cabinet you must first turn off the
disconnect switch. When the cabinet door is open there
is
still power on the top side of the disconnect switch
.
Some machines are powered by more than one supply
located at different locations. Before performing any repairs or mainte-
nance, lockout and tagout
must be installed at all locations
All maintenance and repairs to electrical circuitry should only be per-
formed by a qualified electrician.
Still has power
in OFF position
Electrical
Prior to performing any maintenance, repairs,
cleaning or when clearing jammed debris, you
must disconnect, tag out, or lock out the elec-
trical and air pressure systems. This should be
done in accordance with applicable state and/
or federal code requirements.
Before Conducting Maintenance
Safety First!
1-5
KVAL EP-1 Operation/Service Manual
Содержание EP-1
Страница 1: ...Innovation Quality Honesty Operation and Service Manual Published 1 23 15 EP 1 Edge Prep Machine ...
Страница 4: ...KVAL EP 1 Operation Service Manual ...
Страница 20: ...Getting Help from KVAL 1 14 KVAL EP 1 Operation Service Manual Page Intentionally Left Blank ...
Страница 22: ...Safety Sign Off Sheet 1 16 KVAL EP 1 Operation Service Manual ...
Страница 38: ...How to Power Down the EP 1 2 16 KVAL EP 1 Operation Service Manual ...
Страница 56: ...Troubleshooting the Air Cylinders 4 12 KVAL EP 1 Operation Service Manual ...