Putting into service
Rotary cultivators
EL22
25
Coupling the machine
- Lower the tractor three-point linkage.
- Secure each hitch pin with lynch pin.
- Attach the top link to the hitch pin.
- Secure hitch pin with lynch pin.
- Raise tractor lift linkage to free parking stand.
- Remove lynch pin (1).
- Raise and lock parking stand.
This procedure provides maximum machine
clearance in transport position.
Содержание EL22
Страница 1: ...KN184AGB C OPERATOR S MANUAL Rotary cultivators EL22 KN184AGB C English 11 2009...
Страница 2: ......
Страница 36: ...Rotary cultivators 34 EL22 Optional equipment 2 Category 1 ASAE 5279 Quick Hitch Compatible Kit no 1209270...
Страница 41: ...Limited warranty Rotary cultivators EL22 39 Limited warranty...
Страница 42: ...Rotary cultivators 40 EL22 Limited warranty...
Страница 43: ......
Страница 44: ......