Standard operating procedure (all models)
67
8
AXIS-GENERAL
8.10.2 Running one pass
Layout
Length of testing area: 60 - 70 m
Figure 8.23:
Layout for one pass
Preparing one pass
Select a similar fertiliser from the calibration charts and set the spreader ac-
cordingly.
Set the hopper mounting height of the solid fertiliser broadcaster as specified
in the calibration charts. Make sure that the mounting height includes the top
edge of the trays.
Check the completeness and status of the spreading components (spreading
discs, spreading vanes, outlets).
Place two trays in line as shown in the diagram (distance
1
m) in the overlap
zones (between the tracks) and one tray in the track (corresponding to
NOTICE
We recommend the layout plan up to a spreading width of
24 m
. A layout plan
for larger working widths is included with the practice test kit.
1/2x
1/2x
x
Содержание AXIS 20.1
Страница 4: ......
Страница 12: ...Contents VIII...
Страница 14: ...Intended use 1 2 AXIS GENERAL...
Страница 46: ...Transport without tractor 6 34 AXIS GENERAL...
Страница 48: ...Instructions regarding the spreading process 7 36 AXIS GENERAL...
Страница 156: ...Maintenance and repair C 144 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W...
Страница 194: ...Appendix D 182 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W AXIS 50 1 W...
Страница 214: ......
Страница 215: ......