Silo unloader - Straw spreader - Mixer - Distributor
60
ATHENOR 6070
Instructions for work
9. Distribution
Select the blower speed for feeding: 270 min
-1
.
The distribution chute on the right of the machine is used
for 2 purposes.
For optimal quality of work and product positioning in the
designed place, the distribution chute cap can be set to
three positions.
For easy manual adjustment of the position, open the
chute halfway.
Pull the handle down.
Put the spindle into the desired notch (the most external
one sets the cap to the greatest angle of tilt).
Operating tips:
To stop the distribution (posts, obstacles) disengage the
beater bar. (The conveyor stops at the same time).
To avoid clogging the machine in difficult conditions,
watch the engine speed carefully. Slow down conveyor
speed or even reverse the direction if the engine speed
drops or the belt starts to slip. If it becomes overloaded,
allow it to empty before making the conveyor move
forward again.
Always start the tractor PTO before engaging the
beater bar. Stop the beater bar before stopping
the PTO. If you do not do this in the right order,
you are very likely to block up the blower.
Содержание ATHENOR 6070
Страница 2: ......
Страница 19: ...Safety Silo unloader Straw spreader Mixer Distributor ATHENOR 6070 17 ...
Страница 94: ...Silo unloader Straw spreader Mixer Distributor 92 ATHENOR 6070 Trouble shooting guide ...
Страница 97: ......
Страница 98: ......