9
MOWER MOUNTING
ENGLISH
8. Put a 14 mm (0.55 in.) shaft in the hole in the rear
right side lift link.
A
Use a shaft more than 150 mm (6 in.) long.
A
It passes through a hole in the frame.
9. Attach the lift links to the mower deck with attaching
hardware.
10. Remove the 14 mm (0.55 in.) shaft from the hole in
the rear right side lift link.
11.Attach the mower belt to the PTO clutch pulley.
12.Remove the step.
(See "HOW TO OPEN THE STEP" in "PERIODIC
SERVICE" section.)
13.Turn the tension arm counterclockwise with a square
wrench.
(1) Shaft
(2) Lift link
(3) Frame
(D) 14 mm (0.55 in.)
(L) More than 150 mm (6 in.)
(1) Lift link
(2) Clevis pin
(3) Plain washer
(4) Snap ring
(P) OUTSIDE
(1) Mower belt
(2) PTO clutch pulley
(1) Tension arm
(2) Mower belt
(3) Mower pulley
(A) Square wrench
(P) "COUNTERCLOCK WISE"
Содержание Z724X
Страница 7: ...CONTENTS ENGLISH INDEX 79 ...
Страница 13: ...SAFE OPERATION 6 ENGLISH 5 DANGER WARNING AND CAUTION LABELS ...
Страница 14: ... 7 SAFE OPERATION ENGLISH ...
Страница 15: ...SAFE OPERATION 8 ENGLISH ...
Страница 16: ... 9 SAFE OPERATION ENGLISH ...
Страница 19: ...SERVICING OF MACHINE 2 ENGLISH 1 ROPS serial No ...
Страница 53: ...36 MAINTENANCE ENGLISH PERIODIC SERVICE CHART LABEL 1 Part No K3851 6551 ENGLISH 2 Part No K3851 6552 SPANISH ...