19
ASSEMBLY INSTRUCTIONS
8. Tighten up the lock nuts at both sides of the valve stay
to secure the cables in place.
A
With the lock nuts tight in position, move the lever to
make sure that the cables and spools behave
smoothly as specified.
B
Cable Guide [M7995 (ROPS Model)]
1. Attach the cable guide to the fender.
2. Pass the controller cable through the cable guide.
B
Control Valve Cover
1. Attach the valve cover to the valve stay.
B
Step
Attach the step.
(1) 4-M16 Lock nuts
Tightening torque: 60.0 to 80.0 N-m
(6.1 to 8.2 kgf-m, 44.3 to 59.0 ft-lbs)
(1) Cable guide
(2) 1-M8 x 16 bolt with washers
Tightening torque: See "TIGHTENING TORQUE OF
BOLTS AND NUTS" section.
(1) Cable guide
(2) Controller cable
(1) Valve cover
(2) 3-M8 x 20 bolts with washers
Tightening torque: See "TIGHTENING TORQUE OF
BOLTS AND NUTS" section.
Содержание LA1154
Страница 57: ...55 ASSEMBLY INSTRUCTIONS TEMPLATE FOR CONTROLLER CABLE ...
Страница 58: ......
Страница 59: ...HOLE OF CONTROLLER CABLE ON THE STEP ALIGN TEMPLATE WITH RUBBER MAT OF TRACTOR SLIT THE RUBBER MAT OF TRACTOR ...
Страница 60: ......