SERVICE WORK ON THE CHASSIS
46
201470-11
–
Position the upper triple clamp with the steering.
–
Mount screw
but do not tighten yet.
–
Position the clutch line, wiring harness and CDI control unit. Mount and tighten
screws
.
Guideline
Remaining screws, chassis
M6
10 Nm (7.4 lbf ft)
100891-10
–
Position the fork legs.
Info
The upper milled groove in the fork leg must be flush with the top edge of
the upper triple clamp.
Position bleeder screws
toward the front.
100892-10
–
Fully tighten screws
.
Guideline
Screw, bottom triple clamp
M8
12 Nm (8.9 lbf ft)
100894-10
–
Tighten screw
.
Guideline
Screw, top steering head
M20x1.5
10 Nm (7.4 lbf ft)
100893-10
–
Mount and tighten screw
.
Guideline
Screw, top steering stem
M8
17 Nm
(12.5 lbf ft)
Loctite
®
243™
100892-11
–
Fully tighten screws
.
Guideline
Screw, top triple clamp
M8
17 Nm
(12.5 lbf ft)
Содержание 250 EXC-F AUS
Страница 2: ......
Страница 77: ...WHEELS TIRES 75 Torque wrench with various accessories in set 58429094000 ...
Страница 86: ...COOLING SYSTEM 84 Refit the radiator cap Make a short test ride Check the coolant level p 82 ...
Страница 110: ...SUBSTANCES 108 Super unleaded ROZ 95 RON 95 PON 91 According to DIN EN 228 ROZ 95 RON 95 PON 91 ...
Страница 117: ... 3211689en 3211689en KTM Sportmotorcycle AG 5230 Mattighofen Austria http www ktm com 09 2010 Photo Mitterbauer ...