
SERVICE SCHEDULE
47
S20A
S40A
S80A
J1A
Change the outer clutch hub.
x
•
•
Check the oil pressure regulator valve.
x
•
•
Check the oil pumps and lubrication system.
x
•
•
Check the timing assembly.
x
•
•
Change all engine bearings.
x
•
S20A:
Every 20 operating hours - corresponds to about 140 liters of fuel (37 US gal)
S40A:
Every 40 operating hours - corresponds to about 280 liters of fuel (74 US gal)
S80A:
Every 80 operating hours - corresponds to about 560 liters of fuel (148 US gal)
J1A:
Annually
Содержание 2012 505 SX
Страница 1: ...OWNER S MANUAL 2012 505 SX ATV Art no 3211728en ...
Страница 2: ......
Страница 14: ...VIEW OF VEHICLE 12 3 1 View of the vehicle from the left front example 401377 10 ...
Страница 16: ...VIEW OF VEHICLE 14 3 2 View of the vehicle from the right rear example 401378 10 ...
Страница 137: ...ELECTRICAL SYSTEM 135 Close the cover of the fuse box Install the front cover p 72 ...
Страница 197: ...KTM Sportmotorcycle AG 5230 Mattighofen Austria http www ktm com 08 2011 Photo Mitterbauer 3211728en 3211728en ...