
LX1-1.1.2: D 03.06
5 / 14
5.1. Gear Case & Load Sheave
Refer to Figure 5-1 and proceed as follows:
1) Apply (G3) grease to the cogs of (17) Load Gear.
2) Place (12) Gear Case on a flat surface and set (17) Load Gear to the center of the circular
risen part inside the gear case as shown in Figure 5-1.
3) Align the holes and rims of (12) Gear Case and (11) Frame B.
Figure 5-1 Load Gear and Frame B Attachment to Gear Case
4) Apply (G1) grease to the parts of (18) Load Sheave contacting the holes of (11) Frame B as
shown in Figure 5-2
Figure 5-2 Applying Grease to Load Sheave
5) Align (18) Load Sheave with (17) Load gear as viewed from the hole of (11) Frame B, and
insert the end of the sheave as shown in Figure 5-3.
Figure 5-3 Load Sheave Attachment to Frame B