2.12 LED Indication
LED
Function
Color
State
Interpretation
PWR
Power status
Green
ON
The power is supplied to the switch.
OFF
The
power
is
not
supplied
to
the
switch.
Mgt.
Management
status
Green
OFF
The switch is in initialization and diagnostics.
Yellow BLINK
Initialization
completed
with
diagnostic
error
or
system
error
found
during
normal
operation
Green
ON Initialization
completed
with
no
error
Port 1 ~ Port 8
SPEED_LED Port speed status
Green
ON
Speed is 1000Mbps.
Yellow ON Speed
is
10Mbps
or
100Mbps.
BLINK PoE power is on.
LINK_LED
Port link status
Green
ON
Port link is established. (No traffic)
Green
BLINK Port link is up and there is traffic.
OFF
Port link is down.
Port 9 ~ Port 10
Speed _LED
Port speed/link status Green
ON
A 1000Mbps link is established.
Yellow ON A
100Mbps
link
is
established.
BLINK Activity status
OFF
Port link is down.
2.13 Making Console Connection
The connector designed for the console port is RJ-45.
-24-
Содержание KGS-1060
Страница 13: ...Dimensions 13 ...
Страница 15: ...Dimensions 15 ...