5 Installation at Site
33 of 126
Amacan S
1589.837/01-EN
11. Insert the support rope (f) and the control cable (c) into the spacer (a) and make
sure that they are in their respective ducts.
12. Tighten the cables with the manila rope running over the crane hook.
13. Insert the power cables (b) into the hollows of the spacer (a) and, starting from
the bottom, firmly clamp the power cables with cable clamps (d) covered by a
plastic sheath (e).
14. Progressively lower the pump set into the discharge tube while securing the
cable bundle with evenly spaced sheathed cable clamps.
15. In the area of the lifting lug between the rope sections, lay all cables in loops
and fasten them to the rope section above.
16. Fit a heat shrink tube on any protruding sharp-edged rope ends (e.g. at the
ferrule) to prevent any damage to the power and control cables.
17. Trim the spacer (a) to suit the position of support 59-7 at the support rope (f)
and the type of installation. Insert the support rope and control cable (c).
18. Insert the power cables (b) into the hollows of the spacer (a) and firmly clamp
the power cables with cable clamps (d).
59-7
X
X
733.05
719.05
901
920
550
733.05
719.05
59-24
81-51
(185, 81-39)
3
5
0
-
4
5
0
*
)
5
0
*
*)
3
0
L
243
Fig. 22:
Support rope with support, dimensions in [mm]
*) depending on the cable cross-section,
**) for 1 rope or 3 ropes = 30 mm
Table 8:
Symbols key
Symbol
Description
L
243
Always secure screwed connections marked with this symbol with
Loctite 243
.
19. Clamp support 59-7 with clamping element 81-51 to the support rope (f).
20. Undo the screwed connection at clamping element 81-51.
21. Place clamp 81-39 of the clamping element around the support rope.