EN
11
Leakage
current
measurement
on
2
‐
wire
and
3
‐
wire
circuits.
1.
Set
the
rotary
switch
always
to
the
highest
available
range.
2.
Open
the
jaws
and
insert
the
conductors
(2
or
3
wires)
through
the
jaws.
Make
sure
the
jaws
are
perpendicular
to
the
conductor.
3.
Close
the
clamp
and
make
sure
the
tops
of
the
jaws
are
tightly
shut.
For
optimal
readings,
make
sure
the
conductor(s)
is/are
positioned
centered
between
the
jaws
.
4.
Once
the
reading
stabilizes,
read
the
value.
Use
the
DATA
HOLD
function
if
the
reading
is
difficult
to
read.
Load
current
measurement
1.
Set
the
rotary
switch
always
to
the
highest
available
range.
2.
Open
the
jaws
and
insert
the
conductor
under
test
through
the
jaws.
Make
sure
the
jaws
are
perpendicular
to
the
conductor.
3.
Close
the
clamp
and
make
sure
the
tops
of
the
jaws
are
tightly
shut.
For
optimal
readings,
make
sure
the
conductor
is
positioned
centered
between
the
jaws
.
4.
Once
the
reading
stabilizes,
read
the
value.
Use
the
DATA
HOLD
function
if
the
reading
is
difficult
to
read.
Содержание PANCONTROL PAN Leckstromzange
Страница 1: ...MANUAL PAN Leckstromzange ...
Страница 3: ...BEDIENUNGSANLEITUNG PAN Leckstromzange ...
Страница 17: ...OPERATING MANUAL PAN Leckstromzange ...
Страница 33: ...MANUEL D UTILISATION PAN Leckstromzange Pince de courant de fuite ...
Страница 48: ...ISTRUZIONI PER L USO PAN Leckstromzange Pinza per correnti di fuga ...
Страница 62: ...GEBRUIKSAANWIJZING PAN Leckstromzange Lekstroomtang ...
Страница 76: ...BRUKSANVISNING PAN Leckstromzange strömtång för läckström ...