manualshive.com logo in svg
background image

Krueger | 1401 N Plano Rd | Richardson, TX 75081 | 972.680.9136 | [email protected] | www.krueger-hvac.com

Installation, Operation, & Maintenance for FC Horizontal Basic

Page: 2 of 3

Installation

Installer  must  be  a  trained,  experienced 

service technician.

Pressure Check

 

The  complete  unit  including  coil,  valve  package  and 

associated piping is shipped pressurized. Use the air valve 

to  release  the  pressure.  Should  there  be  no  pressure, 

inspect  the  unit  for  possible  shipping  damage.  The  unit 

must be pressure tested again prior to installation.

Mounting - HFH, HFHP & HFEC ONLY

 

Each unit has four (4) mounting holes. Rubber grommets 

are supplied with each unit. Due to the various installation 

conditions,  the  mounting  bolts/rods,  steel  washers  and 

nuts are field supplied. 

Level the unit to ensure proper condensate drainage.

Mounting - HFI ONLY

 

Each unit is provided with four mounting lugs into which 

rubber  grommets  are  fitted.  Fit  rods  or  bolts  and  use 

suitable  metal  washers  and  nuts  to  secure  the  unit.  To 

adjust  the  telescopic  frame  to  the  ceiling,  remove  eight 

screws which hold the frame, pull out the telescopic bottom 

and adapt it to the ceiling. After exact alignment is made, 

re-screw the telescopic frame with hinged access panel to 

the unit using the same eight screws (two per side).

Level the unit to ensure proper condensate drainage.

Piping

 

All piping leading to the unit must be adequately supported 

to prevent excessive stress on the unit’s piping. However, 

sufficient free movement is required for thermal expansion/

contraction.

1. 

Do NOT over-tighten threaded connections.

2. 

Do NOT overheat sweat connection. Use solder (95/5) 

with a melting temperature below 600°F.

3. 

When  the  valve  package  is  supplied  separately  for 

field installation, carefully follow the schematic piping 

diagram and installation instructions provided with the 

package.

4. 

All pipes and fittings that extend beyond the drain pan 

MUST be insulated.

Electrical

 

All electrical connections are to be made in accordance 

with  the  National  Electric  Code,  state  and  local  codes, 

bylaws,  ordinances  or  the  authority  having  jurisdiction. 

Make all electrical connections inside the electric junction 

box by carefully following the wiring diagram.

1. 

Adhere strictly to the electrical wiring diagram in order 

to avoid damage and/or personal injury.

2. 

When the thermostat and fan switch are field supplied, 

the following are the minimum electrical ratings:

- Thermostat (valve load) = 0.1A @ 115V

  (0.05A @ 230V)

- Fan Motor(s) @ full load = 5A @ 115V

  (2.5A @ 230V)

Filter – HFHP, HFEC, HFI

 

The filter is secured with a filter retainer. To install filter, slip 

filter into the filter rack and fasten it with the filter retainer.

General Precautions

 

After completing the installation, recheck the following: 

1. 

The  drain  pans,  fans  and  motors  are  clean  of  all 

foreign material.

2. 

All  electric  wiring  is  properly  routed,  secure  and 

capped.

3. 

The filter, where provided, is clean and secured in its 

position.

Initial Start-Up 

Chilled/Hot Water Unit

 

1. 

Ensure that the main distribution system is operable 

(i.e.  both  supply  and  return  piping  are  under  full 

operating pressure).

2. 

Open  the  unit’s  isolating  ball  valves  (optional)  and 

observe that no leaks are evident.

3. 

Open the 2-Way or 3-Way Valve (optional) manually 

by moving the lever provided on the valve motor thus 

pressurizing the unit’s coil.

4. 

Remove  the  cap  of  the  air-vent  valve  and  depress 

the needle to release the trapped air. Continue until 

only liquid is coming through, then re-cap and secure 

tightly.

!

Отзывы: