MULT-K
Mult-K
Quick Installation Guide
– Mult-K Revision 3.2 – June, 2020
Connection Diagram Example: CD-00
LINE
LOAD
Страница 1: ...your meter Incorrect cabling connection or applying a voltage signal above the specified limits can damage it severely Ⓐ Mult K Ⓕ Side locks Ⓑ LED display Three rows for parameter checking measurements and configurations Ⓖ Power Supply Input Ⓒ Indicative LEDs Type of parameter currently showed in the display Ⓗ Voltage Input Ⓓ Navigation keys Ⓘ Current Input Ⓔ Indicative LEDs Multiplicative factors...
Страница 2: ... constants for PT and CT connection diagrams integration time demand communication parameters and reset command energies and demands To access this mode hold the and keys simultaneously for three seconds Configuring the Product The first step is to access Function mode by holding the and keys simultaneously until the message Fun appears in L1 Then to navigate through menus use or keys To enter a s...
Страница 3: ...MULT K Mult K Quick Installation Guide Mult K Revision 3 2 June 2020 Quick Installation Guide Connection Diagram Example CD 00 LINE LOAD ...
Страница 4: ...ach meter s channel with the same reference indication Example Va Ia Ia must receive signals from the same phase as stated in steps and Also check if the polarity of CTs is correct Correct Installing Primary side LINE P1 P2 LOAD Secondary side S1 connected to Ix S2 connected to Ix c Which parameter should be read to check energy consumption To read energy consumption info the user must verify the ...