background image

GB-3

D

GB

F

NL

I

E

Oel

4

3

5

10

11

9

16

12

13

7

8

66

17

18

19

20

21

22

15

Unteren

Dichtring circa 

20 mm hoch-

schieben

 

Replace all seals from the conversion kit.

+

+

Oel

4

3

5

10

11

9

16

12

13

7

8

66

17

18

19

20

21

22

15

Slide the 

lower sealing 

ring approx. 

20 mm up.

 4 

  Unscrew the housing cover from the new actua-

tor.

 

The pictures below may not correspond to the 

actual electrical connection.

Oel

4

3

5

10

11

9

16

12

13

7

8

66

17

18

19

20

21

22

15

Unteren

Dichtring circa 

20 mm hoch-

schieben

  

 Turn the damping unit until the hexagon and 

compression fitting are inserted in the housing 
of the damping unit.

 4 

  Push the damping unit onto the actuator applying 

pressure and secure again using two screws.

 

Do not fit the third screw until the start gas rate 
has been set.

 N

2

 <–  1,5 x p

u max

4

3

8

5

6

7

9

10

11

14

13

12

9

10

13

 5 

 Open the air and gas supplies, and switch on 

the power supply.

 6 

 If necessary, set the start gas rate, see page 3 

(Setting the start gas rate).

 7 

 Fully tighten the damping unit.

MB 7, slow opening/slow closing

 

The solenoid actuator remains switched on.

Oel

3

4

2

6

7

8

9

10

11

12

13

14

15

16

17

18

19

23

25

24

 5 

  Disconnect the solenoid actuator from the electri-

cal power supply. Otherwise, the solenoid actua-
tor will heat up unnecessarily.

 

For further disassembly and assembly of the 
actuator, see Figures 

 5 

 to 

  

 under “VAS, 

MB 7, slow opening/slow closing”.

  

 Before fitting the damping unit: switch on the 

solenoid actuator so that the guide pin becomes 
visible.

 WARNING

  Risk of crushing!

  

When the power supply is switched off, the 
damping unit suddenly drops down onto the 

solenoid actuator.

Oel

3

4

2

6

7

8

9

10

11

12

13

14

15

16

17

18

19

23

25

24

Disconnect the 

solenoid actuator 

from the electrical 

power supply. 

The damping 

unit is lowered.

 6 

 Open the air and gas supplies, and switch on 

the power supply.

Setting the start gas rate

 

The start gas rate can be set by turning the 

damping unit a maximum of 3 turns.

 

There must be a period of 20 seconds between 

switching the device off and on again so that the 
damping is fully effective.

 

Undo the screw at the “V

.

   Start” mark by ap-

prox. 1 mm, but do not unscrew completely.

+

V

+

-

+

V

+

V

max. 3 x 360°

1

2

3

Содержание MB 7

Страница 1: ...NG Indicates possible danger to life and limb CAUTION Indicates possible material damage All interventions may only be carried out by qualified gas technicians Electrical interventions may only be carried out by qualified electricians Conversion spare parts All technical changes are prohibited Only use OEM spare parts Contents Operating instructions D GB GB 1 03251461 Translation from the German R...

Страница 2: ...or slow opening and 3 x sealing rings 3 VAS 6 9 VCS 6 9 actuator cartridge with solenoid actuator Replacing the solenoid actuator WARNING Please observe the following to ensure that no damage occurs Electric shocks can be fatal Before working on possible live components ensure the unit is disconnected from the power supply The solenoid actuator heats up during opera tion Surface temperature approx...

Страница 3: ...ow opening slow closing The solenoid actuator remains switched on Oel 3 4 2 6 7 8 9 10 11 12 13 14 15 16 17 18 19 23 25 24 5 Disconnect the solenoid actuator from the electri cal power supply Otherwise the solenoid actua tor will heat up unnecessarily For further disassembly and assembly of the actuator see Figures 5 to 21 under VAS MB 7 slow opening slow closing 22 Before fitting the damping unit...

Страница 4: ...Replacing the solenoid actuator 11 Check for tightness see section entitled Tight ness test in the corresponding operating instruc tions of the device to be converted Logistics Transport Protect the unit from external forces blows shocks vibration On receipt of the product check that the delivery is complete see page 2 Part designa tions Report any transport damage immediately Storage Store the pr...

Отзывы: