Kreg Garage Storage and Work Center Скачать руководство пользователя страница 11

Add the Large Boxes

Next, measure down 24" from the upper end of the towers, and then install the Upper Ledger by driving 3" screws through

it and into the studs (or wall anchors). Then mount the Large Boxes in the same way as used for the Towers and Lower

Boxes.

With everything in place, attach all of the boxes and towers to one another. To do that, drive several screws through one side

and into the adjacent side. You can use 1 1/4" coarse-thread Kreg Pocket-Hole Screws for this. Just drive them straight in. No

pilot holes are needed.

Make a Workbench

Cut a Workbench Top, Workbench Brace, and Workbench Hinge Plate to size from 3/4" plywood, as shown in the cutting

diagram. Then assemble these parts using a long continuous hinge, as shown.

10

11

Page 11 of 13

Содержание Garage Storage and Work Center

Страница 1: ...nit packs almost 40 feet of shelving into a package that s just 8 wide by 6 tall Plus it s equipped with a fold down workbench and a pegboard area for hanging tools Best of all it s built from four sh...

Страница 2: ...evel framing square tape measure sander stud finder Materials Wood Products Board 1x2 X 96 2 Plywood 3 4 X 48 X 96 4 Pegboard 1 4 X 24 X 48 1 Hardware Supplies 1 1 4 Coarse thread Kreg Pocket Hole Scr...

Страница 3: ...4 X 22 1 2 4 Large Box Rail 3 4 Ply X 3 1 2 X 22 1 2 2 Large Box Shelf 3 4 Ply X 15 3 4 X 22 3 8 2 Small Box Side 3 4 Ply X 15 3 4 X 12 4 Small Box Top Bottom 3 4 Ply X 15 3 4 X 22 1 2 4 Small Box Ra...

Страница 4: ...Page 4 of 13...

Страница 5: ...Page 5 of 13...

Страница 6: ...d as shown in the cutting diagram Then with your Kreg Pocket Hole Jig set for 3 4 thcik material drill pocket holes in the Tops Bottoms Dividers and Rails as shown After that you can Drill holes for a...

Страница 7: ...both Tower Sides oriented correctly and that you position the Tower Rail at the top end Make the Large Box Parts Now you can assemble the large boxes using 1 1 4 coarse thread Kreg Pocket Hole Screws...

Страница 8: ...ge Box Sides oriented correctly and that you position the Rail at the top end Make the Small Box Parts Cut the parts for a pair of small boxes four Small Box Sides two Small Box Tops two Small Box Bot...

Страница 9: ...mall boxes using 1 1 4 coarse thread Kreg Pocket Hole Screws as shown Make Ledgers Next you can create a Lower Ledger and an Upper Ledger from 1x2 boards as shown in the cutting diagram Then drill poc...

Страница 10: ...r by driving 3 screws through it and into the studs or wall anchors Mount the Towers and Small Boxes Start at one end to install the first tower You ll want a helper for this Rest the tower on the Low...

Страница 11: ...n place attach all of the boxes and towers to one another To do that drive several screws through one side and into the adjacent side You can use 1 1 4 coarse thread Kreg Pocket Hole Screws for this J...

Страница 12: ...erside of the Large Boxes and then secure the cleat to the wall It doesn t need the heavy duty anchoring that the Ledgers require Just drive a couple screws into the studs or into wall anchors Then at...

Страница 13: ...ed Products Accu Cut Expansion Pack 89 99 Accu Cut 79 99 Rip Cut 39 99 Adaptive Cutting System Plunge Saw 299 99 Adaptive Cutting System 62 Guide Track 99 99 Adaptive Cutting System Master Kit Page 13...

Отзывы: