![Kreg Garage Storage and Work Center Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/kreg/garage-storage-and-work-center/garage-storage-and-work-center_assembly-instructions-manual_2003325010.webp)
Start Installation with Ledgers
To mount the garage unit to your wall, start by locating the studs. If you won’t be able to attach the Ledger to at least five
studs, also use heavy-duty wall anchors at the locations where studs aren’t available. Then, position the Lower Ledger 24"
from the floor, make sure the Ledger is level, and that the pocket holes are facing up. Attach the Ledger by driving 3" screws
through it and into the studs (or wall anchors).
Mount the Towers and Small Boxes
Start at one end to install the first tower. You’ll want a helper for this. Rest the tower on the Lower Ledger, make sure it is
standing straight. Attach it by driving 1 1/4" coarse-thread Kreg Pocket-Hole Screws from the Ledger into the Tower Bottom,
and by driving 3" screws through the Tower Rail and into wall studs (or wall anchors). You can then attach the small boxes,
as well as the other tower. Make sure the upper ends of the towers have 48" of space in between.
8
9
Page 10 of 13
Содержание Garage Storage and Work Center
Страница 4: ...Page 4 of 13...
Страница 5: ...Page 5 of 13...