Network cable tester
ENGLISH
ENG
ENG
KPS SOLUCIONES EN ENERGÍA, S.L.
Parque Empresarial de Argame,
C/Picu Castiellu, Parcelas i-1 a i-3
E-33163 Argame, Morcín
Asturias, España, (Spain)
Anexo A
AT&T258A
8-position Token Ring
EIA/TIA-568B
EIA/TIA-568A
Ethernet 10Base-T
2
1 3 4 5 6 7 8
PR1
PR2
PR4
PR3
PR2 PR1
8
7
6
5
4
3
1 2
2
1 3 4 5 6 7 8
PR1
PR3
PR2
PR4
PR2
PR1
8
7
6
5
4
3
1 2
Anexo
A
&
A
A
o
e n
n
e
x
o
oo
.
-
10 BA E-T T
E RI
AT&T258A EIA/TIA568
n
en
e
een
oo
n
o
e
o
e
TI- ET
R
AB E TE TER
1. RJ45 socket
2. Power indicator
3. Power switch
4. Master unit
5. Cable pairs indicator
6. RJ45 socket
7. BNC socket
8. Remote terminator
9. GND button
10 BNC button
11 BNC indicator
12 BNC socket
Introduction
The multi - network cable tester is widely used for Coaxial Cable ( BNC) , UTP and STP
Cable it can automatically check for open circuits, shorts, miswires, and reversals.
Caution
Do NOT use on live circuits.
Test for twisted-wire- pair cables (RJ45)
The instrument can be used for 10Base- T, EIA/ TIA- 568A, EIA/ TIA- 568B, AT&T258A,
and Token Ring Cable.
1. Connect the master unit to one end of the cable to be tested and connect the remote
terminator to the other end.
2. Push the power switch to ON, the power indicator will flash to show the power is
working properly.
3. The cable pairs indicator on the remote terminator will light one by one. If the indicator is
lighted GREEN, the corresponding twisted wire pair is OK. If the indicator is lighted RED
or it is unlighted, the corresponding twisted wire pair is fail.
4. If the cable is shield (STP), you may test the cable’ s shield integrity. Press and hold down
GND button, the corresponding indicator and GND indicator will light up with all green
except the indicator of pair 3&6 is kept off. If GND indicator is lighted red or unlight ed, it‘s
showing the shield is fail.
Test for coaxial cable ( BNC)
1. Connect the master unit to one end of the coaxial cable to be tested, and connect the
remote terminator to the other end.
2. Push the power switch ON, the power indicator will flash to show the power is working
properly.
3. After the cable is inserted, the BNC indicator should be kept unlighted. If the BNC
indicator is lighted up, then the cable is fail.
4. Press and hold down BNC button which is on the left side of the master unit , the BNC
indicator will light up GREEN if the cable is OK. If indicator lights up RED or no light, the
cable is fail.
Note:
Please make sure the battery has been installed correctly (9 volt 6F22).
ENGLISH
Annex A
Annex B