7
KPS-PF10 • Leakage clamp meter
ENG
4. OPERATING INSTRUCTIONS
AC Current Measurement
1. Set the Slip key of range at desired range position.
2. Set the Slip key of power at “1” (ON) position.
3. Press the trigger to open transformer jaw and to clamp one conductor only,
making sure that the jaw is firmly closed around the conductor.
4. Read the measure result from the display.
5. CLAMP LEAKER LAYOUT
Содержание 602150020
Страница 18: ...18 KPS PF10 Pinça de fugas POR ...
Страница 19: ...19 KPS PF10 Pinça de fugas POR ...