The installer’s responsibilities include:
1. Installation of the outdoor and indoor units in accordance with the warranty conditions and the operating instructions.
2. Making leak-proof plumbing connections of the equipment included in the HPM kit, fixing leaks and any lacks of tightness
in the heating system.
3. Electrical connection of the indoor and outdoor units, connection of outdoor and indoor temperature sensors, the storage
tank, THC, the heating circuit pumps, the circulation pump, the mixing valve and other auxiliary equipment included in the
installation.
4. Proper bleeding of the heating system, the indoor unit, the outdoor unit and the hot tap water exchanger coil. Checking that
the required flow rate in the heating and hot tap water systems and the required pressure in the hydraulic system have been
reached.
5. Adjustment of hydraulic fittings included in the heating system and that are not part of the HPM kit.
6. Carry out an electrical measurements of the voltage supply to the indoor unit.
Necessary steps involving initial commissioning:
1. Commissioning of the heat pump heating system and checking its correct operation (correct setting of operating parameters
and their adjustment to the thermal properties of the building and the installation).
2. Configuration and setting of basic operating parameters (programming of the room temperature and hot tap water).
3. Evaluation of the installation for leaks, disturbing noises (e.g. noise with poor ventilation)
4. Initial instruction of the user on the use of the heat pump system
5. Noting the relevant parameters on the HPM2.Z heat pump commissioning sheet in the operating manual.
6.
Registration of the device by the Commissioning Company after the Initial Commissioning in the electronic system of
Kospel sp. z o.o.: "Registration of the HPM2.Z Heat Pump", not later than 30 days after the device was commissioned.
Activities to be carried out during precommissioning:
Checking the condition of the electrical installation
• Measurement of the supply voltage of the HPMI2 indoor unit: _ _ _ V.
• Checking that the electrical cables in the HPMI2 indoor unit are fitted correctly (tighten the electrical cables).
Leakage assessment of the hydraulic system
• Heating medium pressure reading on the control panel of the HPMI2 indoor unit: _ _ _bar.
Cleaning the dirt separator
• Checking the pressure in the diaphragm vessel in the HPMI2 indoor unit: _ _ _bar.
• Reading of the heating circuit flow rate during operation: _ _ _ _ l/min, inlet temperature: _ _ _ °C, outlet temperature: _ _ _ °C.
Checking zone valves.
Filter cleaning.
Checking the operation of the three-way valve.
Checking the refrigerant pressure of the HPMO2 outdoor unit.
Assessment of the condition and cleaning of the evaporator.
Checking the patency of the condensate drain.
Checking the correctness of the electrical cables fitted in the HPMO2 outdoor unit (tightening the electrical cables).
Technical condition assessment of the outdoor unit.