4
ENG-003B Installation and operation instruction EPJ.P
All installation work has to be
carried out with the electricity
and water supplies cut off.
Recommendation
- the appliance connect to cold
water supplies only
- do not install the spray- head
holder above the heater
- install the spray-head holder on
the same wall where the heater
is installed
Installation - Assembly
1. Fix the mixer [19] on water sup-
ply pipe [15].
2. Undo the two screws[9] and take
the front case [27] off.
3. Connect the mixer by the use of
metal pipes with the heater in
order to mark the fixing points
for the screws [32].
4. Drill holes at the marked places,
insert the screws [32] in there.
5. Insert electric wires into the
heater through the stuffing [5]
picture 5.
6. Install the heater onto the wall.
7. Connect the mixer and the sho-
wer set with the heater.
8. Connect electric supplies accor-
ding to Diagram 2.
9. Fix the front case and screw it up.
10. Install the shower holder.
11. Let the mains water pressure to
get to the mixer.
12. Check connections for leaks.
13. Vent the installation.
14. Switch electric supplies on (fuses).
Picture 1 View EPJ.P-... version
[4] - flow regulating valve
[9] - screws for fixing the case
[12] - filter
[13] - gasket
[15] - water supply
[16] - rosette
[17] - extension
[19] - tap body
[23] - sprayhead
[24] - heating on indicator
[26] - nuts
[27] - front case
[28] - back case
[29] - tap
[30] - fixing screw
[31] - sleeve
[32] - pin
[33] - shower set
1
Installation
Содержание EPJ.P-4
Страница 1: ......
Страница 11: ...11 ENG 003B Installation and operation instruction EPJ P ...
Страница 12: ......