background image

•  Phillips Head Screwdriver
•  Solder
•  Center Punch or Marker
•  Drill
•  Soldering Iron
•  Wire Strippers
•  Desoldering Tool (Such as Hakko 808 or Similar)

Tools Required For Installation

1) Remove all slider caps from the ARP, then remove all PCBs from chassis.  
Desolder all old CTS sliders and remove them from the boards.  Always be 
sure not to damage PCB traces when doing this.  
When all sliders have been removed, clean the PCBs of dust and flux.  

Installation of Sliders

Figure 1 - Test Fitting all Sliders (ARP Omni 2 shown)

Содержание LED slider

Страница 1: ...ARP Odyssey Avatar LED Slider Installation Manual...

Страница 2: ...electronics please seek out the skills of a qualified technician who can install this kit The installation should take between 4 and 8 hours in most cases Take your time and always check twice before...

Страница 3: ...ed For Installation 1 Remove all slider caps from the ARP then remove all PCBs from chassis Desolder all old CTS sliders and remove them from the boards Always be sure not to damage PCB traces when do...

Страница 4: ...gether and all GND pins together It is easy to make a mistake and reverse the polarities when using the longer cables Be sure to double check your work before you solder Figure 2 Slider Wiring Assembl...

Страница 5: ...gently moiving them or heating up the tack solder joint Don t hold the soldering iron tip to the tack solder joint for more than 2 4 seconds Too much heat can cause the slider adapter PCB pins to bec...

Страница 6: ...ht if the LFO on the ARP is running In this case we will only be running the LED circuit on the sliders This step can be done after you have wired the 5V LED supply into place Using a preferably non c...

Страница 7: ...Figure 5 Slider Assembly Powered LED brightness being adjusted on each slider...

Страница 8: ...Figure 6 ARP Odyssey 2800 Board A Installed...

Страница 9: ...Figure 7 ARP Odyssey 2800 Board B Installed Note that this wiring is different from the suggested method as shown in PCB drawings below...

Страница 10: ...Figure 8 ARP Odyssey 2800 Board C Sliders Installed...

Страница 11: ...GND V FEMALE CONNECTOR 1MD Drawing 1 ARP Odyssey 2800 Suggested Wiring Diagram BOARD A...

Страница 12: ...GND V GND V 100KB 100KB 100KB 100KB GND V GND V GND V GND V SRC MALE CONNECTOR TO BD A FEMALE CONNECTOR TO BD C 100KB 100KB 100KB 100KB 100KB 100KB 100KB 100KD 100KD 100KD 100KD 100KD 100KD 100KD 1MD...

Страница 13: ...1MD GND V 1MD GND V 100KD GND V 100KD GND V 100KD GND V 100KB GND V 100KB GND V 100KB GND V 100KD GND V 1MD GND V 1MD GND V 100KB GND V 1MD MALE CONNECTOR TO BD B FEMALE CONNECTOR TO 5V POWER SUPPLY D...

Страница 14: ...e same as the transformer on the ARP Find a location near the transformer where the ballast can be mounted Use the mounting template and make starter marks using a punch Drill the mounting holes for t...

Страница 15: ...Figure 11 Marking Mounting Holes for Drilling Figure 12 Power Supply Mounted In Case...

Страница 16: ...witch Figure 13 AC Mains Wiring for LED Ballast 6 The ground black wire of the 5V ballast must be connected to the ground of your ARP s power supply This is done to provide a ground reference to the b...

Страница 17: ...Figure 14 Extra Grounding Wire 5V Power Wiring Figure 15 Finished LED Ballast Wiring...

Отзывы: