
20
Appendix | Korenix
Picture 8: The demo diagram of PoE, routing, NAT & DMZ ....................... 10
Picture 9: The frame captured by the PoE IP camera ................................ 11
Picture 10: The demo diagram of serial service mode—TCP server & VCOm
......................................................................................................... 12
Picture 11: Serial port configuration| Service mode of the JetBox 9310
Web UI ............................................................................................. 13
Picture 12: Hyper terminal connection—Physical COM ............................ 13
Picture 13: Hyper terminal connection—TCP/IP ....................................... 13
Picture 14: Key in some words in hyper terminal ...................................... 14
Picture 15: The demo diagram of serial service mode—TCP server & VCOm
......................................................................................................... 14
Picture 16: Add a VCOM in your notebook ............................................... 15
Picture 17: the JetBox Virtual COM Commander ...................................... 15
Picture 18: the JetBox Virtual COM in the device manager ....................... 15
Picture 19: Serial port configuration| Service mode of the JetBox 9310
Web UI ............................................................................................. 16
Picture 20: Hyper terminal connection—Physical COM ............................ 16
Picture 21: Hyper terminal connection—VCOM ....................................... 17
Picture 22: Key in some words in hyper terminal ...................................... 17
Picture 23: The demo diagram of DIO control and Web UI ....................... 18
Picture 24: DIO configuration| Digital output control in the JetBox 9310
Web UI ............................................................................................. 19
Picture 25: DIO configuration| DIO status in the JetBox 9310 Web UI ..... 19
Notice (Limitation of this demo box)
Notice 1: There is a fuse near the demo box power switch to protect the
demo box from the improper current. The power input for the demo
box is 110~240V AC. .......................................................................... 7
Notice 2: Please connect power (positive and negative) correctly, otherwise
the devices might be damaged. .......................................................... 9
Notice 3: While the JetBox 9310 is booting up, the status of all digital
outputs are temporary high. ............................................................... 9
Notice 4: All snapshots are for image reference only, not real settings of
demo processes.................................................................................. 9
Notice 5: In this DIO demo, you need to enable DO 0 to provide the power
to DIs first, otherwise, DIs don’t have power to do the demo. Keep DO
0 enabled during this DIO demonstration. ........................................ 18