D-26
Look at the stop position of the Take-Up Roller from Clutch Gear side.
(6)
Disassembly of the Fusing Unit
NOTE
•
The Fusing Unit is extremely hot immediately after the Power Switch has been turned
OFF. Allow a sufficient time to let it cool down before starting the procedure to prevent
burn.
1. Remove the Fusing Unit.
☞
After setting replaced Paper Take-Up Clutch Gear
(Torque Limiter) to the shaft, Rotate the Paper Take-
Up Clutch Gear by hand (Need to be released Sole-
noid Flapper).
4136D060AA
1. When the Roller is leant to clockwise, move the
coupling Gear to A direction.
4136D046AA
2. When the Roller is leant to counter clockwise,
move the coupling Gear to B direction.
4136D045AA
2. Remove the two screws, and then the Fusing Unit
is divided into the Upper Fusing Roller section
and Lower Fusing Roller section.
4136D021AA
Upper Fusing
Roller section
Lower Fusing
Roller section
Содержание Di1610
Страница 16: ...GENERAL...
Страница 24: ...MAINTENANCE...
Страница 34: ...DIS REASSEMBLY ADJUSTMENT...
Страница 82: ...CONTROL PANEL SERVICE MODE DESCRIPTIONS...
Страница 86: ...S 4 2 3 PWB IF Interface Board 4980S004AA USB port IEEE1284 parallel port...
Страница 106: ...TROUBLESHOOTING...
Страница 114: ...T 8 2 3 Locations of Misfeed Detection Sensors 4980M005AA Exit Sensor PS1 Paper Take Up Switch S1...
Страница 146: ...AF 11 Service Manual...
Страница 148: ...ii 1 The Original misfeeds T 7 3 TIMING CHART T 8...
Страница 149: ...GENERAL...
Страница 151: ...DIS REASSEMBLY ADJUSTMENT...
Страница 167: ...TROUBLESHOOTING...
Страница 176: ...PF 125 Service Manual...
Страница 178: ...GENERAL...
Страница 180: ...DIS REASSEMBLY ADJUSTMENT...