Chapter 7 Periodic Maintenance
7-16
7.2.12 Move to the Installed Location
Move the equipment back to the installed location if it was moved.
1
Move the optical unit to the second front side and
fix it using the simple fixing lock.
2
Move the equipment back to the installed
location.
3
Release the lock on the optical unit.
4
Fix the equipment using the adjuster (4 locations).
Check the level inside the second front door and make
sure the bubble is inside the circle.
5
Gently push the equipment to confirm that it is
fixed firmly.
This completes the movement to the installed location.
Go to
and turn the power ON on the equipment.
7.2.13 Power ON
Connect the Ethernet cable and power cable to the equipment and turn ON the power.
1
Connect the Ethernet cable and the power supply cable.
2
Turn ON the power supply circuit breaker.
3
Press the "operation" switch.
Operation is possible once "READY" is displayed in the message display window.
This completes the maintenance operation performed annually.
Important
Push the optical unit slightly towards the
back when pulling up the knob. Fixing shaft
might move down, and get locked again if
the optical unit is at its hithermost position.
Also, move the optical unit to confirm that
the fixing shaft is not lowered after
unlocking.
Level
Содержание 0902
Страница 2: ......
Страница 6: ......
Страница 12: ......
Страница 30: ...2 10...
Страница 54: ......
Страница 84: ...Chapter 3 Troubleshooting 3 30 3 2 19 Confirm the H sync Signal To be stated...
Страница 85: ...Chapter 3 Troubleshooting 3 31 3 2 20 Confirm the LMC Operation To be stated...
Страница 120: ......
Страница 296: ...8 10...
Страница 300: ......
Страница 301: ......