922-20207011/1.0
77
Verifying that the Flexview is ready for
operational use
Topics
Verifying that operational power is correct, page 77
Verifying that all hardware is properly installed, page 78
Verifying that all Flexview cables are properly connected, page 79
Verifying that operational power is correct
The Flexview operates on AC power from the vessel’s mains supply. Before you apply AC
power to any Flexview unit, you must verify that the voltage is correct.
Prerequisites
Before you can do this task, the following prerequisites must be met:
• All Flexview hardware units have been installed according to the relevant instructions.
• All system cables have been installed.
• All operating power is available.
• All relevant personnel (ships electrician) and tools (for example a voltmeter) are available.
Procedure
1
For each Flexview unit that operates on AC mains:
a
If necessary, measure the voltage in the mains outlet.
b
Make sure that the relevant Flexview unit can operate on the power provided.
2
Make sure that each circuit breaker on the power circuit can handle the load when the
Flexview is turned on.
3
If applicable, make sure that the power rating of the uninterruptable power supply
(UPS) or true sine wave inverter is capable of supplying enough power to the Flexview.
Содержание Flexview
Страница 1: ...Installation Manual Flexview Multibeam Sonar ...
Страница 2: ......
Страница 8: ...6 922 20207011 1 0 Flexview ...
Страница 95: ...922 20207011 1 0 93 Flexview Sonar Head 500 kHz outline dimensions Drawing file ...
Страница 96: ...94 922 20207011 1 0 Flexview Installation Manual ...
Страница 97: ...922 20207011 1 0 95 Drawing file ...
Страница 98: ...96 922 20207011 1 0 Flexview Sonar Head 950 1400 kHz outline dimensions Flexview Installation Manual ...
Страница 99: ...922 20207011 1 0 97 Drawing file ...
Страница 100: ...98 922 20207011 1 0 Flexview Installation Manual ...
Страница 126: ... 2019 Kongsberg Mesotech ...