Lifting units and transportation boxes
Some of the boxes used to hold equipment units may be heavy. Use caution when lifting.
Prerequisites
Units and boxes may be heavy. Make sure that you have the necessary equipment
required for lifting heavy items. Persons using the lifting equipment must be skilled and
have the relevant certificate(s).
Context
A heavy box will normally be marked with its weight. The weights of other boxes in the
shipment will normally be entered on the packing list(s).
Heavy units may be equipped with dedicated lifting lugs for transportation by crane
within the workshop or installation area.
Note
Observe the local rules and regulations related to the use of lifting equipment.
Procedure
1
Check the weight of the box or unit before you attempt to lift it.
2
Make sure that you have the relevant lifting apparatus required, and that this
equipment is approved and certified for the load.
3
If you need to use a crane:
a
Check the applicable weight certificate for the crane.
b
Check the security of the lifting lugs.
c
If the unit to be lifted is provided with dedicated lifting lugs, make sure that all
available lugs are used.
d
Make sure that the unit remains under full control during the lifting operation.
This is important to avoid damage to the unit, equipment or personnel.
4
If you need to use a forklift truck:
a
Check the applicable weight certificate for the truck.
b
Check the limitations for lifting height and angles.
c
Pay special attention to the position of the unit’s centre of gravity.
KONGSBERG EM 2040 MKII Installation Manual
Содержание EM 2040 MKII
Страница 8: ...8 472405 A KONGSBERG EM 2040 MKII...
Страница 92: ...92 472405 A Related topics List of cables page 101 KONGSBERG EM 2040 MKII Installation Manual...
Страница 107: ...472405 A 107 Related topics Cable plan Hydrographic Work Station page 100 Cable layout and interconnections...
Страница 177: ...472405 A 177 338208 RX transducer outline dimensions 0 7 degrees Drawing file...
Страница 178: ...178 472405 A 338207 TX transducer outline dimensions 0 7 degrees KONGSBERG EM 2040 MKII Installation Manual...
Страница 179: ...472405 A 179 337805 TX transducer outline dimensions 0 4 degrees Drawing file...
Страница 180: ...180 472405 A 353631 Transducer mounting plate 0 7 x 0 7 degrees KONGSBERG EM 2040 MKII Installation Manual...
Страница 181: ...472405 A 181 355913 Transducer mounting plate 0 4 x 0 7 degrees Drawing file...
Страница 182: ...182 472405 A 359252 Baffle plate 0 7 x 0 7 degrees KONGSBERG EM 2040 MKII Installation Manual...
Страница 183: ...472405 A 183 385422 Processing Unit dimensions Drawing file...
Страница 184: ...184 472405 A 424178 Portable Processing Unit dimensions KONGSBERG EM 2040 MKII Installation Manual...
Страница 185: ...472405 A 185 464618 HWS dimensions MC330 Rack model Drawing file...
Страница 186: ...186 472405 A 475694 HWS dimensions MC330 Desktop model KONGSBERG EM 2040 MKII Installation Manual...
Страница 187: ...472405 A 187 370275 Remote Control Unit K REM dimensions Drawing file...
Страница 188: ...188 472405 A 373962 Remote Control Unit K REM wiring diagram KONGSBERG EM 2040 MKII Installation Manual...
Страница 247: ......
Страница 248: ...2021 Kongsberg Maritime...