![Komatsu PC360LC-11 Скачать руководство пользователя страница 121](http://html1.mh-extra.com/html/komatsu/pc360lc-11/pc360lc-11_operation-and-maintenance-manual_1991259121.webp)
(F) Switch F1: Moves to the left item. (When on the left end, it
moves to the right end.)
(G) Switch F2: Moves to the right item. (When on the right end,
it moves to the left end.)
(H) Switch F3: Moves to the item below (forward). (When on
the last line, it moves to the first line on the next page.)
(I) Switch F4: Moves to the item above (backward). (When on
the first line, it moves to the last line on the previous page.)
(J) Switch F5: Cancels any change and returns the screen to
the previous screen.
(K) Switch F6: Enters the selection and contents to change,
and proceeds the screen to the next screen.
REMARK
• Even if some icons look the same, their display positions
and corresponding function switches may differ according
to the screens to be displayed.
• For the guidance icons and their functions not explained
above, see the pages where the control methods of re-
spective screens are explained.
WORKING MODE SELECTOR SWITCH
Use working mode selector switch to set the movement or pow-
er of the work equipment.
The operation becomes easier by selecting the mode to match
the content of the operation.
P mode: For heavy-duty operations
E mode: For operations with emphasis on fuel consumption
L mode: For fine control operations and lifting operations
B mode: For breaker operations
ATT/P mode: For operations of 2-way attachments like crusher
(machines ready for installation of attachment)
ATT/E mode: For operations emphasizing fuel consumption out
of those of 2-way attachments like crusher (machines ready
for installation of attachment)
• When the monitor is turned ON, it is automatically set to
the mode used when the starting switch was turned to
OFF position last.
OPERATION
EXPLANATION OF COMPONENTS
3-45
Содержание PC360LC-11
Страница 2: ......
Страница 22: ......
Страница 49: ...Map with mirror and rear view camera visibility aids fitted SAFETY PRECAUTIONS FOR OPERATION 2 27 ...
Страница 76: ......
Страница 77: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 344: ......
Страница 345: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 425: ...SPECIFICATIONS 5 1 ...
Страница 429: ...PC360NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Страница 430: ......
Страница 450: ...PC360LC 11 2 Piece Boom PC360NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 20 ...
Страница 457: ...ATTACHMENTS AND OPTIONS 17M LONG REACH BOOM AND ARM 6 27 ...
Страница 465: ...ATTACHMENTS AND OPTIONS SUPER LONG FRONT BOOM AND ARM 6 35 ...
Страница 499: ...REPLACEMENT PARTS 7 1 ...
Страница 515: ......