2-53
PC290-ENG
3.
Set the safety lock lever
c
to the FREE position, and raise the
bucket from the ground.
4.
(Mono Boom)
Operate bucket control lever
v
and arm control lever
b
slowly to
move the bucket cylinder and arm cylinder to the end of the stroke.
4-A (Two Piece Boom)
Left equipment control lever
This is used to operate the arm and swing.
Arm operation
Direction A
: Arm OUT
Direction B
: Arm IN
Swing operation
Direction C
: Right swing
Direction D
: Left swing
N position (Neutral):
The swing and arm are stopped and held in the same position.
4-B (Two Piece Boom)
Right work equipment control lever
This is used to operate the boom and backhoe bucket.
Boom operation
Direction 1
: 1
ST
Boom RAISE
Direction 2
: 1
ST
Boom LOWER
Backhoe operation
Direction 3
: Bucket DUMP
Direction 4
: Bucket CURL
N. Position (Neutral):
The boom and bucket are stopped and held in the same position.
Caution
Before starting the excavator, push the horn 5 on the control lever.
12. OPERATION
Содержание PC290LC-6K
Страница 2: ......
Страница 44: ...1 32 PC290 ENG MEMO ...
Страница 45: ...2 1 PC290 ENG OPERATION ...
Страница 146: ...2 102 PC290 ENG MEMO ...
Страница 147: ...3 1 PC290 ENG MAINTENANCE ...
Страница 171: ...3 25 PC290 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Страница 223: ...4 1 PC290 ENG SPECIFICATIONS ...
Страница 225: ...4 3 PC290 ENG 25 SPECIFICATIONS PC290LC 6K ...
Страница 226: ...4 4 PC290 ENG 25 SPECIFICATIONS PC290NLC 6K ...
Страница 230: ...4 8 PC290 ENG 25 SPECIFICATIONS Mono Boom ...
Страница 233: ...5 1 PC29 ENG OPTIONS ATTACHMENTS ...
Страница 264: ...5 30 PC29 ENG MEMO ...