5-10
PC29-ENG
28. MACHINES READY FOR ATTACHMENTS
MOUNTING PROCEDURE
1.
Remove the bucket.
For bucket dismounting procedure, see 12.16 “REPLACEMENT
AND INVERSION OF BUCKET’’.
2.
Place the attachment on a flat place, install pins
A
and
B
to the arm
in that order.
3.
After mounting the attachment, stop the engine. Operate each work
equipment control lever and the attachment control pedal to full
stroke back and forth, right and left to eliminate the internal pressure
in the hydraulic circuit.
4.
After confirming low oil temperature, remove the blind plug from the
outlet and inlet port respectively.
Take care that no dust, mud, etc. adheres to the hose mouthpiece
portions.
If O-ring is damaged, replace it with a new one.
Connect attachment hoses to arm tubes and store the blind plugs in
a clean dry place.
5.
Turn the rotor of the stop valve connected to the inlet and outlet pip-
ing on the arm side to the flow position.
6.
Confirm that oil level in the hydraulic oil tank is correct, after mount-
ing the attachment.
pin b
pin a
Содержание PC290LC-6K
Страница 2: ......
Страница 44: ...1 32 PC290 ENG MEMO ...
Страница 45: ...2 1 PC290 ENG OPERATION ...
Страница 146: ...2 102 PC290 ENG MEMO ...
Страница 147: ...3 1 PC290 ENG MAINTENANCE ...
Страница 171: ...3 25 PC290 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Страница 223: ...4 1 PC290 ENG SPECIFICATIONS ...
Страница 225: ...4 3 PC290 ENG 25 SPECIFICATIONS PC290LC 6K ...
Страница 226: ...4 4 PC290 ENG 25 SPECIFICATIONS PC290NLC 6K ...
Страница 230: ...4 8 PC290 ENG 25 SPECIFICATIONS Mono Boom ...
Страница 233: ...5 1 PC29 ENG OPTIONS ATTACHMENTS ...
Страница 264: ...5 30 PC29 ENG MEMO ...