MAINTENANCE PROCEDURES
227
(1) Bucket-link connection pins (1 point)
(2) Arm–bucket connection pin (1 point)
(3) Arm–link connection pin (1 point)
(4) Bucket cylinder rod end (1 point)
(5) Link connection pin (1 point)
(6) Boom swing bracket pin (1 point)
(7) Boom base pin (1 point)
(8) Boom cylinder base pin (1 point)
(9) Boom cylinder rod end (1 point)
(10) Boom cylinder base pin (1 point)
(11) Boom cylinder rod end (1 point)
(12) Boom–arm connection pins (1 point)
(13) Bucket cylinder base pin (1 point)
NOTE
q
Grease cartridge: See page parts book.
WEAM012405
Содержание PC16R-3
Страница 2: ......
Страница 24: ...22 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Страница 25: ...SAFETY AND ACCIDENT PREVENTION 23 WEAM012405...
Страница 79: ...THE MACHINE AND ITS OPERATIONS 77 WEAM012405...
Страница 190: ...188 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Страница 191: ...MAINTENANCE 189 WEAM012405...
Страница 244: ...242 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Страница 245: ...TECHNICAL SPECIFICATIONS 243 WEAM012405...
Страница 253: ...AUTHORISED OPTIONAL EQUIPMENT 251 WEAM012405...
Страница 286: ...284 WEAM012405...
Страница 287: ......
Страница 288: ...2017 KOMATSU ITALIA MANUFACTURING S p A All Rights Reserved Printed in Europe 02 2017...