204
ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER (BREAKER)
4 - Working with the hammer in horizontal position or even with
greater inclination.
5 - Lever with the tool after thrusting it into the material to be bro-
ken.
6 - Hitting the ground with the hammer bit.
7 - Lifting the machine by levering on the hammer bit with the
bucket cylinder extended to the end of its stroke.
RWA06490
RWA06500
RWA06510
RWA06520
Содержание PC12R-8
Страница 2: ......
Страница 12: ...10...
Страница 20: ...18...
Страница 21: ...SAFETY AND ACCIDENT PREVENTION...
Страница 23: ...SAFETY NOISE AND VIBRATION PLATES 21 RWA05440...
Страница 27: ...SAFETY NOISE AND VIBRATION PLATES 25 EMERGENCY EXIT LIFTING POINT RWA00190 RWA04920...
Страница 55: ...THE MACHINE AND ITS OPERATIONS...
Страница 88: ...86...
Страница 120: ...118...
Страница 121: ...MAINTENANCE...
Страница 177: ...TECHNICAL SPECIFICATIONS...
Страница 198: ...196...
Страница 199: ...AUTHORISED OPTIONAL EQUIPMENT...