3
Kohler Co., Kohler, WI
106128-2-
AA
(A)
ROUGH-IN PLUMBING
Turn off the water supply.
Install or relocate the supplies and outlets as necessary
to conform to the roughing-in dimensions. For shut-off
valve location, see Fig. #3.
3. INSTALLATION
INSTALL NEW SHUT-OFF VALVE
For supply installation, refer to the instructions packed
with the supply stop.
Locate the supply shut-off valve so it is 10-1/4” above the
floorline, and 5-3/4” to the left of the centerline of the clos-
et flange.
Fig. #3
5-3/4”
10-1/4”
12”
Install new 5/16” diameter T-bolts.
Fig. #4
Closet Flange
T-Bolts
INSTALL TOILET GASKET
Position the toilet upside down on padding.
Firmly attach the gasket around the toilet outlet. If you are
using a gasket with an integral plastic sleeve, position the
gasket with the sleeve facing away from the toilet.
If desired, place a 1/4”-thick bead of toilet setting com-
pound around the toilet base.
NOTE: If a rag or other plug was placed in the closet
flange, remove the rag before setting the toilet.
Fig. #5
Gasket
ALIGN AND SET TOILET
Carefully align and lower the toilet over the closet flange
and T-bolts.
CAUTION: Risk of external leakage. Do not lift or
rock the toilet after placement. A new gasket must
be reapplied if you break the watertight seal.
Apply full body weight to the toilet rim to set the seal.
Fig. #6
Содержание WELLWORTH WATERGUARD K-3520
Страница 8: ...8 106128 2 AA A Kohler Co Kohler WI...