-2-
Install the Basin
Note!
The lavatory tops must be installed on a cabinet or
matching metal stand (refer to Installation and User Guide
packed with the cabinet or stand for installation details).
Recommend Kohler metal square leg or Kohler bathroom
furniture for support or decoration.
!
(
)
!
·
76mm
·
Rough-in the supplies and the drain piping.
The supply stop handles cannot extend more than
76mm from the finish wall when in the open position.
NOTE:
·
·
10mm
(
)
65-
75mm
1.
2
3
2.
·
·
Drill two 10mm hanger bolt holes at the marks on the wall.
The nylon anchors is needed for concrete wall (supplied).
Mount hanger bolts to the wall so approximately 65-75mm
of each bolt remains exposed.
1. Height dimensions marked in fig. 2 and fig. 3 could
be adjusted per your the vanity height or the actual
height of the console leg.
2. Other fastening devices of sufficient size and
strength may also be used.
NOTE:
K-15095T
Fig.#1
1
Attachment
Bolt (x2)
Wall Plug
550mm
Waste
Outlet
Waste
630mm
805mm
80mm
769mm
Fig.#2
2
125
165
805
70
35
205
45
380
700
130
454
540
URBANITY 1100mm Vanity
K-15096T
1100mm
K-15096T
1130444-T01-A