INSTALLATION
-2-
1. Make sure the place to install the drain is the
lowest point of the whole finished floor.
Pre-installation preparations: Clean the
drainage pipeline with water and ensure it is
unblocked. Block the pipeline orifice with cloth
to prevent blocking due to articles falling into
the pipeline during installation.
1.
2. Reserve height for the drainage pipeline
according to the pipeline diameter and the
height of the intended finished floor. Refer to
Fig.a.
2.
a
3. Take out the drain body, cover and core. Put
the plastic shell into the pipeline and then
caulk the gap with pre-blended cement and
mortar (1:1). Refer to Fig.b.
3.
(1:1)
b
Plastic Shell 1
1
Stub-out
Intended Finished Floor
a
b
4. Level the drain and install it according to the
pre-decided installation height. Caulk the
surrounding gaps. Refer to Fig.b.
4.
b
5. Put the plastic cover in place. Drill holes on
the floor tile (refer to Fig.c.) and then tile the
floor.
5.
2
(
c
)
c
Plastic Cover 2
2
Plastic Shell 1
1
102-105
102-105
1172459-T01-A