background image

-7-

Install and adjust door glass.

STEP

7

STEP

8

Insert side seal into the inside of the fix glass. Install blocks on top and bottom frames to make the fixed glass
firm.

Insert side seal.

Install blocks.

Install top roller.

Install bottom roller.

1278975-T01-A

Содержание SKYLINE K-705876T-FM-SHP

Страница 1: ...wering area It is not allowed for any presence of electric switches and sockets Make sure the floor drain runs smoothly Before starting the door installation lay out and identify all the parts Use the exploded view illustrated on page 3 for reference For the installation method of customized shower with different dimensions please refer to this instructions Tempered glass cannot be cut drilled or ...

Страница 2: ...05876T 1200 1600 1850 2000 800 820 2628 IMPORTANT 800 820 2628 Before installation check that all components are correctly supplied If any parts are missing please ring the helpline PARTS IDENTIFICATION PARTS IDENTIFICATION B H H B 1278975 T01 A ...

Страница 3: ...nce Top Roller Assy Skyline Sliding Door Glass Skyline Sliding Csk Screw ST3 5X6 ST3 5X6 Top Roller Assy Skyline Sliding Bottom Roller Assy Skyline Sliding Top Cover B Skyline Sliding Top Cover A Skyline Slidin Twist Lock Jamb Moulding Assy Skyline Sliding Screw Cap Bar Pressing Block Skyline Slidin Hollow Wall Anchor Nylon Pan Screw ST3 5X40 ST3 5X40 Csk Screw ST3 5X20 5 ST3 5X20 5 Csk Screw ST3 ...

Страница 4: ... Sealant Tools Required 6mm INSTALLATION REQUIREMENTS INSTALLATION REQUIREMENTS INSTALLATION Mark the wall 20mm in from the front edge of the tray on both sides 20mm STEP 1 IMPORTANT MUST Tray be level along front edge Mark the wall 20mm in from the front edge of the tray 20mm IMPORTANT Tray must be level in all planes or door will not install properly 0mm 4 1278975 T01 A ...

Страница 5: ...vertical must 0mm Fix wall jambs One is fixed on the wall The other is not fixed on the wall after the holes are drilled 20mm Note There is only holes on the top frame Section of frame Inside Outside A A 6mm STEP 3 Note Before fixing top and bottom frames make sure wall and wall jamb is properly connected 1278975 T01 A ...

Страница 6: ...two sides Then rotate the lock to fix wall jamb Insert the unfixed wall jamb into the frame Then insert the whole wall jamb and fix the unfixed wall jamb STEP 4 The wall jamb be kept vertical must 0mm Insert the unfixed wall jamb X X Rotate clockwise to lock IMPORTANT MUST Tray be level along front edge 0mm Use U shaped protective seals on top and bottom of the fixed glass U 1278975 T01 A ...

Страница 7: ...r glass STEP 7 STEP 8 Insert side seal into the inside of the fix glass Install blocks on top and bottom frames to make the fixed glass firm Insert side seal Install blocks Install top roller Install bottom roller 1278975 T01 A ...

Страница 8: ...e fixed glass and both sides of the bottom threshold STEP 10 Install cover extrusion and top cover STEP 9 Install seals and handle Note Cut the seals to proper length to prevent scrunching the wall jamb and glass Install decorative seal 1278975 T01 A ...

Страница 9: ...Do not use the enclosure for at least 24 hours 24 24hrs STEP 12 9 1278975 T01 A ...

Отзывы: