2. Preparation
For K-1398 Whirlpool Only:
CAUTION: Risk of personal injury.
Wear safety goggles when
marking, prick punching, and drilling holes.
NOTE:
Tape the templates into place to simplify procedure.
Position Template #1 on the bath rim (drain side) as shown.
Mark and drill two 1-1/2
″
(3.8 cm) holes for the valves.
Position Template #2 on the bath rim (drain side) as shown.
Mark and drill a 2
″
(5.1 cm) hole for the transfer valves.
Mark and drill a 1-1/4
″
(3.2 cm) hole for the handshower hose
guide.
Mark the centerline of the bath on the bath wall opposite the
drain side.
NOTE:
Do not locate the template lower than 3
″
(7.6 cm) down from
the bath bench.
Position Template #3 (metal) on the bath rim (drain side) as
shown.
Mark the five hole locations on the bath wall.
Drill 1/8
″
(3 mm) pilot holes at each of the five locations.
At the center pilot hole, drill a 1-3/8
″
(3.5 cm) hole for the spout
sleeve.
Drain
Template #1
Template #2
Template #3 (Metal)
3" (7.6 cm)
Fastener Holes (4 Required)
Spout Sleeve Hole
Bath Bench
Centerline of
Bath Fitting
Kohler Co.
5
113762-2-CD