-5-
8
Cut excess.
9
Fix bolt cap.
6 mm
Max
6mm
Cut excess.
6 mm
Max
6mm
10
Connect supply and turn on the water.
10mm Supply Alimentation
10mm
11
Flush several times and check for leaks.
12
Fill Float With Ballast
Test flush the toilet.
Periodically check all connections for leaks for several
days following installation.
Set the tank cover in place on the tank.
13
Minor Adjustment of Water Level
Move the snap along "OPEN" direction.
OPEN
a
Snap
SCALE
5:1
OPEN
CLOSE
1182020-T01-A