14
114189-2-
CA
(9608)
Kohler Co., Kohler WI
14. INSTALL FINISH WALL
NOTICE: Before covering the framing, perform the
following procedure: Open the hot and cold water
valves, and check all supply connections for leaks. Fill
the whirlpool to the overflow, and check the overflow and
drain connections for leaks. Operate the whirlpool for 5
minutes, and again check all connections for leakage.
Protect the whirlpool surface. Cover the framing and
walls with water-resistant wall material. Tape and mud
the wall material. Seal the wall material and joints under
the whirlpool rim. Install the finish wall material to the
subwall. Use silicone sealant to seal the joints between
the whirlpool rim and the finish wall.
Stud
Water-Resistant Wall
Material
Finish Wall
Covering
Silicone
Sealant
Whirlpool
15. INSTALL KICK STRIP
NOTE: Install kick strip after the finished flooring is
installed.
With the paper backing still attached, position the kick
strip along the outline of the whirlpool base.
Begin at one end, and peel back a few inches of the
paper backing from the kick strip.
Align the end of the kick strip to the finish wall and the
bottom of the whirlpool base. Lightly press the kick strip
to the whirlpool base.
Peeling back a few inches of paper backing at a time,
continue aligning and pressing the kick strip to the
whirlpool base.
After the kick strip is completely applied, go over the
entire length with firm pressure to secure the kick strip
to whirlpool base.
Kick strip