background image

1015627-X2-A

2

Kohler Co.

Tools and Materials

We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don’t hesitate
to contact us. Our phone numbers and website are listed on the back cover.
Thanks again for choosing Kohler Company.

Thank You For Choosing Kohler Company

†

Observe all local plumbing and building codes.

†

Prior to installation, unpack the new lavatory and inspect it for damage.
Return the lavatory to its protective carton until you are ready to
install it.

†

These instructions are for installing the lavatory to wood and concrete
construction. For other installations, supply suitable bracing and
fastening devices of sufficient size and strength.

†

The walls and floor must be square, plumb, and level.

†

Fixture dimensions are nominal and conform to tolerances in ASME
Standard A112.19.2M.

Before You Begin

Содержание Pinoir K-2035

Страница 1: ...Installation Guide PinoirTM Pedestal Lavatories 1015627 X2 A K 2035 X product numbers are for Thailand i e K 12345X ...

Страница 2: ...k You For Choosing Kohler Company Observe all local plumbing and building codes Prior to installation unpack the new lavatory and inspect it for damage Return the lavatory to its protective carton until you are ready to install it These instructions are for installing the lavatory to wood and concrete construction For other installations supply suitable bracing and fastening devices of sufficient ...

Страница 3: ...hanger according to the roughing in information Carefully lift the lavatory into place on the hanger and level You may need to raise or lower the hanger so the lavatory contacts the wall evenly NOTE The lavatory must be supported by the hanger Locate the two lavatory anchoring holes and mark the hole locations on the finished wall Carefully position the shroud under the lavatory and mark the finis...

Страница 4: ...marked lavatory mounting locations on wood finished wall or 5 16 on concrete finished wall and install anchor into the mounting holes Position hanger against the wall Use screw 3 16 5 mm and washer to secure the hanger to the finished wall and backing material Make sure the hanger is level ...

Страница 5: ... hanger Level the lavatory and carefully secure the lavatory to the wall with lag bolts and washers Tighten until snug Connect and tighten the trap to the drain and complete the water supply connections to the faucet according to the instructions packed with the faucet Apply six self adhesive gaskets to the top of the shroud as shown CAUTION Risk of product damage Do not overtighten the lag bolts ...

Страница 6: ...เครื องมือและวัสดุที ใช สำหรับการติดตั ง ข อสังเกตก อนเริ มการติดตั ง ขอขอบคุณที เลือกใช ผลิตภัณฑ โคห เลอร ค ูมือการติดตั ง อ างล างหน าแบบแขวนพร อมขาตั งลอย ร ุนพีนัวร K 2035 1015627 X2 A 1 Kohler Co ...

Страница 7: ...1 เตรียมการติดตั ง ข อสังเกต Kohler Co 2 1015627 X2 A ...

Страница 8: ...2 ติดตั งขอแขวนเข ากับผนัง 1015627 X2 A 3 Kohler Co ...

Страница 9: ...ข อควรระวัง ความเสี ยงซึ งอาจทำให สุขภัณฑ เสียหาย ข อควรระวัง ความเสี ยงซึ งอาจทำให สุขภัณฑ เสียหาย 3 ติดตั งอ างล างหน า ล างมือ Kohler Co 4 1015627 X2 A ...

Страница 10: ...1015627 X2 A 1 Kohler Co ...

Страница 11: ...Kohler Co 2 1015627 X2 A ...

Страница 12: ...สุขุมวิท แขวงคลองเตยเหนือ เขตวัฒนา กรุงเทพ 10110 ฝ ายลูกค าสัมพันธ โทร 0 2204 6222 โทรสาร 0 2204 6224 KOHLER THAILAND PUBLIC COMPANY LIMITED 16th FL Jasmine City Bldg 2 Sukhumvit 23 Wattana Bangkok 10110 Thailand Call Center Tel 66 2204 6222 Fax 66 2204 6224 E mail callcenterthailand kohler com www kohler com ...

Отзывы: