Fig.#2a
Fig.#3a
Fig.#3b
3. SELECT P-TRAP OR S-TRAP
to install your toilet according to the drain and shut-off valve’s Roughing-in dimensions.
1037406-LM01-B -3-
4. INSTALL THE TOILET & CONNECT WATER SUPPLY
Place the toilet in its final location. Use plastic drill guide and 8mm drill bit to drill floor mounting holes for installation over concrete. Use
4mm to 4.5mm drill for wood floor installation. See Fig.#4a.
Install anchors and caps.
WARNING:
Do not over tighten floor bolts, as damage to the vitreous can occur.
NOTE: Do not use white cement or high lime content cements to install this toilet. The expansion of cement due to a rise in
temperature may make the toilet crack or cause damage. Kohler is not responsible for any damage caused by installation with the
use of cement.
3
S-trap installation
P-trap installation
100
1
2
0
180
305
50
305
100
120
5
0
180