background image

ROUGHING-IN

INSTALLATION

1. REMOVE EXISTING TOILET

Turn off water supply. Flush the toilet and use a sponge to remove the remaining water from the tank and bowl. Disconnect the supply 
shut-off valve (if present) and remove the old tank and bowl.

2. ASSEMBLE TANK BOLTS & WASHERS

Slip bolt heads into mounting hole on bottom of tank. Place large foam washer on base of flush valve. See Fig. #2a. Place tank on 
bowl and attach with nuts & washers from under bowl. See Fig. #2b.

1037406-LM01-B                                                                -2-

Fig.#1

202

786

10

390

475

305

102

13

S-trap

8766LM

733

350

257

364

163

155

430

390

704

340

262360

166

155

430

391

202

782

10

386

90

396

180

160

102

P-trap

8711LM

Ÿ

All dimensions in mm. Fixture dimensions are nominal and conform to tolerances as per ASME Standard A112. 19.2M.

Ÿ

Product pictures shown are representative only, actual products may vary.

Ÿ

Kohler reserves the right to make changes in product characteristics, packaging or availability at any time without notice.

Содержание ODEON K-8766

Страница 1: ...s tank K 8710LM Includes tank K 8710LM NOTES Ÿ Observe all local plumbing and building codes Ÿ Shut off the water supply Ÿ Ensure that the new drain and shut off valve have the correct roughing in dimensions See Fig 1 Ÿ Be very careful while working with vitreous china products Vitreous china can break or chip if the bolts or nuts are overtightened or if carelessly handled Ÿ Carefully inspect the ...

Страница 2: ...ee Fig 2a Place tank on bowl and attach with nuts washers from under bowl See Fig 2b 1037406 LM01 B 2 Fig 1 202 786 10 390 475 305 102 13 S trap 8766LM 733 350 257 364 163 155 430 390 704 340 262360 166 155 430 391 202 782 10 386 90 396 180 160 102 P trap 8711LM Ÿ All dimensions in mm Fixture dimensions are nominal and conform to tolerances as per ASME Standard A112 19 2M Ÿ Product pictures shown ...

Страница 3: ...over concrete Use 4mm to 4 5mm drill for wood floor installation See Fig 4a Install anchors and caps WARNING Do not over tighten floor bolts as damage to the vitreous can occur NOTE Do not use white cement or high lime content cements to install this toilet The expansion of cement due to a rise in temperature may make the toilet crack or cause damage Kohler is not responsible for any damage caused...

Страница 4: ...VEL Turn on water supply check for leaks If necessary adjust black float adjustment clip and sliding float up or down on metal float rod until water level at marked level line Make sure the arrow on the green float on the white flush valve is secure and pointing to Fig 5A 1037406 LM01 B 4 Fig 5 5B Float 5A Float Adjustment clip 6 6 5B ...

Страница 5: ...Remove the locknut place the push button assy through the hole on lid cover of tank fix with locknut Put green grey push rods into corresponding buttons trim length as per requirement Install the button rod assembly in respective position in the push button Flush the toilet several times and check all connections for leak 1 2 3 4 1037406 LM01 B 5 8 Install seat with hardware provided See Installat...

Страница 6: ...th an inverted cup holding it to prevent overspray and turn water on and off a few times Clean float valve seal surface located under float valve cap Replace float valve cap assembly by engaging lugs and rotating 1 8 turn clockwise Turn water on Install filter in supply line to prevent recurring problems B Replace seal C During fill cycle hold float under water a few seconds to allow it to fill wi...

Страница 7: ...1037406 LM01 B 7 This Page is left blank intentionally ...

Страница 8: ...1037406 LM01 B 8 Toll Free 1800 4KOHLER ...

Отзывы: