ROUGHING-IN
INSTALLATION
1. REMOVE EXISTING TOILET
Turn off water supply. Flush the toilet and use a sponge to remove the remaining water from the tank and bowl. Disconnect the supply
shut-off valve (if present) and remove the old tank and bowl.
2. ASSEMBLE TANK BOLTS & WASHERS
Slip bolt heads into mounting hole on bottom of tank. Place large foam washer on base of flush valve. See Fig. #2a. Place tank on
bowl and attach with nuts & washers from under bowl. See Fig. #2b.
1037406-LM01-B -2-
Fig.#1
202
786
10
390
475
305
102
13
S-trap
8766LM
733
350
257
364
163
155
430
390
704
340
262360
166
155
430
391
202
782
10
386
90
396
180
160
102
P-trap
8711LM
Ÿ
All dimensions in mm. Fixture dimensions are nominal and conform to tolerances as per ASME Standard A112. 19.2M.
Ÿ
Product pictures shown are representative only, actual products may vary.
Ÿ
Kohler reserves the right to make changes in product characteristics, packaging or availability at any time without notice.