32
Relief Valve Assembly - Resetting
WARNING!
Isolate the electrical and water supplies before removing the cover. Mains
electricity connections are exposed when the cover is removed.
1.
Remove the three screws that hold the cover, remove the cover.
Note!
The rubber ball is ejected to reduce the damage if the outlet is blocked or
the appliance is frozen.
2.
Remove the five screws that hold the switch assembly, heater tank and, flow
regulator assembly.
3.
Lift out the switch assembly, heater tank and flow regulator assembly.
4.
Using your finger push the ball back into the tank. Do not remove the 'O' seal.
5.
Refit the components in reverse order.
6.
Replace the cover. If the cover does not fit easily, rotate the knobs slightly so
that they fit into the spindles. Do not force the cover.
Ball
Screws
Heater
Tank
Flow Regulator
Assembly
Switch Assembly
Ball
Содержание Mira Zest 7.5
Страница 1: ...1 THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER ELECTRICSHOWER Installation User Guide...
Страница 8: ...8 Specifications Dimensions 205mm 103mm 53mm 310mm...
Страница 9: ...9 WiringDiagram...
Страница 42: ...42 Notes...
Страница 43: ...43 Notes...