1.
Preparation
Install sufficient backing behind the finished wall to provide adequate support to
secure the mounting hardware.
Install the water supplies and drain piping according to the roughing-in
information. Ensure the supply stop handles will not make contact with the
pedestal when the supplies are fully open.
Apply six self-adhesive gaskets (provided) to the underside of the basin as shown.
Mark the centerline location on the floor. Refer to the roughing-in information for
the required distance.
Position the pedestal on the marked centerline.
IMPORTANT!
The lavatory basin
must
be supported by the pedestal.
Carefully lift the basin and position it on the pedestal.
Verify the basin is properly supported by the pedestal.
Slowly move the pedestal as needed until the basin is positioned against the wall
at the installation location.
Level the basin by adding additional self-adhesive gaskets as needed.
CAUTION: Risk of personal injury or product damage.
Product can break, chip,
or cause injury if handled carelessly. The pedestal and basin are not secured; have
someone hold the basin while you mark the mounting hole locations.
Locate the two basin mounting holes, and mark the hole locations onto the
finished wall.
Mark the hole location of the pedestal onto the floor.
Basin
Bassin
Lavabo
Finished Wall
Mur fini
Pared acabada
Mark floor here.
Marquer le sol ici.
Marque el piso aquí.
Pedestal
Colonne
Pedestal
Apply adhesive gaskets.
Appliquer des joints adhésifs.
Aplique los empaques adhesivos.
Underside of Basin
Base du bassin
Parte inferior del lavabo
Centerline
Ligne centrale
Línea central
Install backing.
Installer de renfort.
Instale del refuerzo.
Mark mounting holes.
Marquer les orifices de fixation.
Marque los orificios de fijación.
Kohler Co.
7
1087256-2-B
Содержание Memoirs K-2238
Страница 14: ...1087256 2 B Kohler Co ...
Страница 15: ...Kohler Co 1087256 2 B ...
Страница 16: ...1087256 2 B ...