background image

13-1

528437

INSTALLATION INSTRUCTIONS

L

PIVOT DOOR, L-SHAPE

K-36971T

MATTIA

-1-

, 2010

Copyright Kohler China Ltd., 2010

BEFORE YOU BEGIN

BEFORE YOU BEGIN

·

·

·

·

·

·

2

(

)

50~80mm

3mm/m

·

·

·

·

·

·

Before you install your shower door, please read
these instructions carefully to familiarize yourself
with the required tools, materials, and installation
sequences. Follow the sections that pertain to your
particular installation. This will help you avoid costly
mistakes. In addition to proper installation, read all
operating and safety instructions.
All information is based on the latest product
information available at the time of publication.
Kohler China Ltd. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
These instructions contain important care, cleaning,
and warranty information-

Make sure that the bath and the finished wall
material are completely and correctly installed prior
to installing your shower door. Prepare waterproof
layer to wall and floor of the showering area. It is not
allowed for any presence of electric switches and
sockets. Make sure the floor drain runs smoothly.
Before starting the door installation, lay out and
identify all the parts. Use the exploded view
illustrated on page 2 for reference.
For the installation method of customized shower
with different dimensions, please refer to this
instructions.

Tempered glass cannot be cut, drilled or knocked
by hard object. Make sure corner area of the
glass refraining from knocking so as to cause
personal injury due to broken glass.

Please install this door on Kohler

receptors or curbs. (Not included). If the curb is not
Kohler-branded, please note its top width should fall
within the range of 50~80mm.

The shower door requires a flat vertical

finished wall. The squareness of the wall is
recommended no more than 3 mm/m. KOHLER
Company won t take responsibility of the installation
quality.

please leave these

instructions for the consumer.

CAUTION: Risk of injury or product damage.

ATTENTION:

IMPORTANT:

1120770-T01-C

Содержание MATTIA K-36971T

Страница 1: ...led prior to installing your shower door Prepare waterproof layer to wall and floor of the showering area It is not allowed for any presence of electric switches and sockets Make sure the floor drain...

Страница 2: ...ENTIFICATION PARTS IDENTIFICATION Unit mm SKU B C H K 36971T 900 1000 700 1000 1870 2000 H C 15 B 15 Sealing Strip Sealing Strip Cover Strip Cover Strip Side Panel Wall Channel X2 X2 Door Panel Assemb...

Страница 3: ...vel Materials Required Drop Cloth Tape Silicone Sealant Tools Required 6mm INSTALLATION REQUIREMENTS INSTALLATION REQUIREMENTS Top Caps Splashguard Door Handle Assembly Spacer 4mm Allen Key 4mm 3mm Al...

Страница 4: ...H fitting is a mirror image of these instructions DOOR SIDE The door must be installed with the pivot by the wall not the side panel IMPORTANT Tray must be level in all planes or door will not install...

Страница 5: ...he wall channel MUST NOT x3 6mm x3 x3 x3 0mm Fit the panel wall channel to the wall STEP 6 Note Fixing block must be on the inside edge of the wall channel Wall channel be vertical on front face MUST...

Страница 6: ...refully slide the panel into the wall channel Engage the mouldings but do not lock into place at this moment STEP 9 Fix the panel to the door at top and bottom Note The holes in the glass are larger t...

Страница 7: ...t base of the top track Locked position STEP 12 STEP 11 7 STEP 13 STEP 14 Lift the door into place Locate the bottom pivot pin into the collar the insert into the pivot base Ensure the door is fully s...

Страница 8: ...rs through 90 to lock the door assembly to the wall channel 90 o Unlocked Locked 3mm 3mm A If the tray has been fitted level the gap under the glass panel should be 3mm along its length and the bottom...

Страница 9: ...seals to the side of the door and the side of the panel Fit the cover strip to the panel wall channel Start at the bottom and tap into place with a block of wood or similar STEP 20 STEP 19 9 STEP 21...

Страница 10: ...rs over the glass fixing clamps top and bottom STEP 23 STEP 24 STEP 25 STEP 26 Lay a thin bead of sealant between wall channel and wall on both sides Lay a thin bead of sealant along the bottom of tra...

Отзывы: