Tools and Materials
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don’t
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.
Before You Begin
Please read all instructions before you begin.
Observe all local plumbing and building codes.
Shut off the water supply.
A 1/2
″
ceramic high-flow valve system, K-300-K, is required (not
supplied) with this product. Please read the instructions packed
with the valve for installation procedures.
Complete the finished deck material before installing the bath
faucet trim.
Before installation, unpack the new bath faucet trim and inspect it
for damage. Return it to the carton until installation.
Kohler Co. reserves the right to make revisions in the design of
faucets without notice, as specified in the Price Book.
Adjustable
Wrench
• Rag
Plus:
Tube Cutter
Tape
Measure
Hex
Wrench
Assorted
Screwdrivers
File
Plumbers
Putty
1057840-2-A
2
Kohler Co.