6. Install Tile (If Applicable)
Verify that there will be a 1” (2.5cm) to 1–1/2” (3.8cm) distance from
the top of the sleeve to the top of the tile. If there is not, correct the
valve clearance as described earlier.
Install tile up to the plaster guards on the valves and the spout
supply tube.
NOTE:
The final stem heights for both K-300 and K-301 valves are
1–13/16” (4.6cm) minimum to 2–5/16” (5.9cm) maximum from the
top of the valve to the top of the tile.
Sleeve
Tile
Rough
Deck
Threaded
Collar
Spout Supply Tube
1" (2.5cm) MIN.
1-1/2" (3.8cm) MAX.
1-13/16" (4.6cm) MIN.
2-5/16" (5.9cm) MAX.
1017937-2-A
12
Kohler Co.
Содержание K-T10278
Страница 46: ...1017937 2 A ...
Страница 47: ...1017937 2 A ...
Страница 48: ...USA 1 800 4 KOHLER Canada 1 800 964 5590 México 001 877 680 1310 kohler com 2003 Kohler Co 1017937 2 A ...