Hot Temperature Adjustment
CAUTION: Risk of product damage.
Do not overtighten the
head nut. Excessive torque may damage the head nut.
Turn both integral supply stops outward until they contact the
stop bracket.
Detach the removal clip from the head nut.
Remove the head nut from the assembly by turning the head nut
counterclockwise.
Remove the detent collar with the spring from the cartridge.
Remove the valve spline adapter.
NOTE:
The spring on the detent collar may fall off. Reattach the
spring around the detent collar if this occurs.
Turn the valve stem fully counterclockwise.
NOTE:
Leave the detent collar off while making adjustments.
Reinstall the head nut to the valve casting. Hand tighten the head
nut until the shoulder of the head nut contacts the lip of the
valve casting.
Turn both integral supply stops inward.
Turn on the water using the volume control valve (not shown).
Allow the water to flow for several minutes to stabilize the water
temperature.
Head Nut
Removal Clip
Removal
Clip Tab
Detent Collar
with Spring
Valve Spline
Adapter
Integral
Supply
Stop
Stop Bracket
Integral Supply Stop
Valve Stem
Adapter Tab
Hot
Tab
1041158-5-B
6
Kohler Co.
Содержание K-669
Страница 41: ...1041158 5 B ...
Страница 42: ...1041158 5 B ...
Страница 43: ...1041158 5 B ...
Страница 44: ...USA 1 800 4 KOHLER Canada 1 800 964 5590 México 001 877 680 1310 kohler com 2005 Kohler Co 1041158 5 B ...